Plan for the vent from July 20th, 2010

Goals

  • Installation of the green periscopes
  • Installation of PRM (approximate places) and 2 TT suspensions
  • Installation of the IPPOS/IPANG steerings (approcximate places)
  • Align 1064nm beam to the south arm

Doors to be opened:

  • ITM-South: West door
  • BSC: North door
  • -
  • ETM-South: West door
  • MC access connector

Plan:

  • Pre-vent work
    • 20mW incidence to MC
  • Vent
    • Place BS
    • Steering mirror
    • IP mirrors
    • PRM
    • 2 TTs
    • Green steering / periscope
    • How to align South arm?
  • Post-vent work

Prospect:

  • We will be able to align the recycling mirror against the IFO beam - this is a preparetion of the REFL beam alignment
  • We will be able to work with the green locking (PLL, ALS)
  • -
  • MC1/MC3 OSEM adjustment
  • MC1/MC3 bias adjustment (frame rotation)
  • How to find IPANG beam?