Differences between revisions 6 and 9 (spanning 3 versions)
Revision 6 as of 2010-04-07 21:49:01
Size: 854
Editor: RanaAdhikari
Comment:
Revision 9 as of 2010-04-20 00:02:00
Size: 859
Editor: KojiArai
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
attachment:newlayout.png
<<ImageLink(newlayout.png,PSL Table,height=600)>>[[BR]]

Overview

  1. We will be removing the MOPA and replacing it with a 2W NPRO.
  2. Instead of current shunt, we will change to use an AOM for the fast power stabilization actuator.
  3. We may decide to use a DC coupled servo, with a remotely programmable offset point to be more like the aLIGO system.
  4. Move the reference cavity and its optics to a different pickoff point.
  5. Move the ISS to the end of the PSL table.
  6. Re-engineer the optics for the PSL_POS and PSL_ANG QPDs.
  7. New EOM for triple modulation.
  8. Change the FSS modulation frequency?
  9. Change the FSS RFPD to have a low Q?
  10. Remove the PMC RF modulation (apply it via the NPRO)?
  11. Steel enclosure for the PMC to do temperature stabilization?

newlayout.pngBR

FSS

New NPRO

PMC

ISS

Modulator