|
Size: 844
Comment:
|
Size: 1080
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 16: | Line 16: |
| ---- /!\ '''Edit conflict - other version:''' ---- |
|
| Line 21: | Line 25: |
| ---- /!\ '''Edit conflict - your version:''' ---- === FSS === === New NPRO === === PMC === === ISS === === Modulator === ---- /!\ '''End of edit conflict''' ---- |
Overview
- We will be removing the MOPA and replacing it with a 2W NPRO.
- Instead of current shunt, we will change to use an AOM for the fast power stabilization actuator.
- We may decide to use a DC coupled servo, with a remotely programmable offset point to be more like the aLIGO system.
- Move the reference cavity and its optics to a different pickoff point.
- Move the ISS to the end of the PSL table.
- Re-engineer the optics for the PSL_POS and PSL_ANG QPDs.
- New EOM for triple modulation.
- Change the FSS modulation frequency?
- Change the FSS RFPD to have a low Q?
- Remove the PMC RF modulation (apply it via the NPRO)?
- Steel enclosure for the PMC to do temperature stabilization?
attachment:newlayout.png
Edit conflict - other version:
FSS
New NPRO
PMC
ISS
Modulator
Edit conflict - your version:
FSS
New NPRO
PMC
ISS
Modulator
End of edit conflict
