Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2010-04-07 21:35:42
Size: 446
Editor: RanaAdhikari
Comment:
Revision 5 as of 2010-04-07 21:48:20
Size: 1080
Editor: RanaAdhikari
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
 * [[PSL Overview]]
 * [[MOPA]]
 * [[Pre Mode Cleaner]] (PMC)
 * [[Frequency Stabilization Servo]] (FSS)
 * [[Intensity Stabilization Servo]] (ISS)
 * [[Mach Zender]] (MZ)
 * [[PSL Table Diagram]]
== Overview ==
 1. We will be removing the MOPA and replacing it with a 2W NPRO.
 1. Instead of current shunt, we will change to use an AOM for the fast power stabilization actuator.
 1. We may decide to use a DC coupled servo, with a remotely programmable offset point to be more like the aLIGO system.
 1. Move the reference cavity and its optics to a different pickoff point.
 1. Move the ISS to the end of the PSL table.
 1. Re-engineer the optics for the PSL_POS and PSL_ANG QPDs.
 1. New EOM for triple modulation.
 1. Change the FSS modulation frequency?
 1. Change the FSS RFPD to have a low Q?
 1. Remove the PMC RF modulation (apply it via the NPRO)?
 1. Steel enclosure for the PMC to do temperature stabilization?
Line 9: Line 14:
== References == attachment:newlayout.png
Line 11: Line 16:
 * [http://www.ligo.caltech.edu/~dugolini/psl.pdf 40m PSL Test and Commissioning Report (T010145-00)]. (This is very old and almost none of the parameters/layout are still the same) ----
 /!\ '''Edit conflict - other version:'''
Line 13: Line 19:
== MEDM screen == ----
=== FSS ===
=== New NPRO ===
=== PMC ===
=== ISS ===
=== Modulator ===
----
 /!\ '''Edit conflict - your version:'''
Line 15: Line 28:
attachment:psl-screen.png ----
=== FSS ===
=== New NPRO ===
=== PMC ===
=== ISS ===
=== Modulator ===
----
 /!\ '''End of edit conflict'''

----

Overview

  1. We will be removing the MOPA and replacing it with a 2W NPRO.
  2. Instead of current shunt, we will change to use an AOM for the fast power stabilization actuator.
  3. We may decide to use a DC coupled servo, with a remotely programmable offset point to be more like the aLIGO system.
  4. Move the reference cavity and its optics to a different pickoff point.
  5. Move the ISS to the end of the PSL table.
  6. Re-engineer the optics for the PSL_POS and PSL_ANG QPDs.
  7. New EOM for triple modulation.
  8. Change the FSS modulation frequency?
  9. Change the FSS RFPD to have a low Q?
  10. Remove the PMC RF modulation (apply it via the NPRO)?
  11. Steel enclosure for the PMC to do temperature stabilization?

attachment:newlayout.png


  • /!\ Edit conflict - other version:


FSS

New NPRO

PMC

ISS

Modulator


  • /!\ Edit conflict - your version:


FSS

New NPRO

PMC

ISS

Modulator


  • /!\ End of edit conflict


Upgrade_09/PSL (last edited 2012-01-03 23:03:06 by localhost)