|
Size: 1135
Comment:
|
← Revision 16 as of 2012-01-03 23:03:06 ⇥
Size: 1182
Comment: converted to 1.6 markup
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 14: | Line 14: |
| <<ImageLink(newlayout.png,Upgrade 09/PSL,height=600)>>[[BR]] | [[Upgrade 09/PSL|{{attachment:newlayout.png||height=600}}]]<<BR>> |
| Line 20: | Line 20: |
| [attachment:2W_INNOLIGHT_manual.pdf 2W Innolight manual (PDF)] | [[attachment:2W_INNOLIGHT_manual.pdf|2W Innolight manual (PDF)]] |
| Line 22: | Line 22: |
| [attachment:2W_INNOLIGHT_data_sheet.pdf 2W Innolight data sheet (PDF)] | [[attachment:2W_INNOLIGHT_data_sheet.pdf|2W Innolight data sheet (PDF)]] |
| Line 24: | Line 24: |
| [attachment:2W_INNOLIGHT_item_list.pdf 2W Innolight item list (PDF)] | [[attachment:2W_INNOLIGHT_item_list.pdf|2W Innolight item list (PDF)]] |
| Line 27: | Line 27: |
| <<ImageLink(PvsI_2W.jpg,"Upgrade 09/PSL")>>[[BR]] | [["Upgrade 09/PSL"|{{attachment:PvsI_2W.jpg}}]]<<BR>> |
Overview
- We will be removing the MOPA and replacing it with a 2W NPRO.
- Instead of current shunt, we will change to use an AOM for the fast power stabilization actuator.
- We may decide to use a DC coupled servo, with a remotely programmable offset point to be more like the aLIGO system.
- Move the reference cavity and its optics to a different pickoff point.
- Move the ISS to the end of the PSL table.
- Re-engineer the optics for the PSL_POS and PSL_ANG QPDs.
- New EOM for triple modulation.
- Change the FSS modulation frequency?
- Change the FSS RFPD to have a low Q?
- Remove the PMC RF modulation (apply it via the NPRO)?
- Steel enclosure for the PMC to do temperature stabilization?
FSS
New NPRO
- P-I curve
PMC
ISS


