| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| * '''Pre-vent works''' * Tuning of the MC servo ~ low power MC test * End transmon X/Y Optics relocations (before the vent) for green * ITM pointing preparations? (green/red pointers at the both ends) |
|
| Line 8: | Line 13: |
| * ITM pointing preparations? (green/red pointers at the both ends) | |
| Line 36: | Line 40: |
| * '''Green installation''' |
* ''' before vent''' * relocation of existing optics at the end table * '''during vent''' * set up the green stuff onto the end table * align the green laser to the cavity (how to ?) * mode matching of the green laser to the cavity * ''' after closing the tanks''' * recover IP-ANG and optical levers |
40m upgrade installation plan
Main optics team
Pre-vent works
- Tuning of the MC servo ~ low power MC test
- End transmon X/Y Optics relocations (before the vent) for green
- ITM pointing preparations? (green/red pointers at the both ends)
Vent
- What to do before the vent?
- Tuning of the MC servo ~ low power MC test
- ITM pointing preparations? (green/red pointers at the both ends)
ITM placement
- What to do before the ITM placement?
- Suspension assembly
- Gluing test
- Optics cleaning
- Gluing (magnets/standoffs/guide rods)
- Suspending
- procedure
MMT placement
- What to do before the MMT placement?
- Optics delivery (Shipping Feb 25) / baking
Initial Pointing adjustment
SRM/PRM/BS placement
- What to do before the SRM/PRM/BS placement?
- TT
- Closing up the vacuum
Green team
before vent
- relocation of existing optics at the end table
during vent
- set up the green stuff onto the end table
- align the green laser to the cavity (how to ?)
- mode matching of the green laser to the cavity
after closing the tanks
- recover IP-ANG and optical levers
CDS team
RF team
PSL table upgrade
- Laser delivery (done)