| * Vent | * '''Vent''' |
| Line 7: | Line 7: |
| * low power MC test * ITM pointing preparations? (green pointers at the both ends) |
* Tuning of the MC servo ~ low power MC test * ITM pointing preparations? (green/red pointers at the both ends) * ITM pointing preparations? (green/red pointers at the both ends) |
| Line 10: | Line 11: |
| * ITM placement | * '''ITM placement''' |
| Line 19: | Line 20: |
| * MMT placement | * '''MMT placement''' |
| Line 23: | Line 24: |
| * Initial Pointing adjustment | * '''Initial Pointing adjustment''' |
| Line 25: | Line 26: |
| * SRM/PRM/BS placement | * '''SRM/PRM/BS placement''' * What to do before the SRM/PRM/BS placement? * TT |
| Line 33: | Line 36: |
| * Green installation | * '''Green installation''' |
| Line 43: | Line 46: |
| == RF team == --------- |
40m upgrade installation plan
Main optics team
Vent
- What to do before the vent?
- Tuning of the MC servo ~ low power MC test
- ITM pointing preparations? (green/red pointers at the both ends)
- ITM pointing preparations? (green/red pointers at the both ends)
ITM placement
- What to do before the ITM placement?
- Suspension assembly
- Gluing test
- Optics cleaning
- Gluing (magnets/standoffs/guide rods)
- Suspending
- procedure
MMT placement
- What to do before the MMT placement?
- Optics delivery (Shipping Feb 25) / baking
Initial Pointing adjustment
SRM/PRM/BS placement
- What to do before the SRM/PRM/BS placement?
- TT
- Closing up the vacuum
Green team
Green installation
CDS team
RF team
PSL table upgrade
- Laser delivery (done)