Line 5: Line 5:
 * Vent  * '''Vent'''
Line 7: Line 7:
  * low power MC test
  * ITM pointing preparations? (green pointers at the both ends)
  * Tuning of the MC servo ~ low power MC test
  * ITM pointing preparations? (green/red pointers at the both ends)
  * ITM pointing preparations? (green/red pointers at the both ends)
Line 10: Line 11:
 * ITM placement  * '''ITM placement'''
Line 19: Line 20:
 * MMT placement  * '''MMT placement'''
Line 23: Line 24:
 * Initial Pointing adjustment  * '''Initial Pointing adjustment'''
Line 25: Line 26:
 * SRM/PRM/BS placement  * '''SRM/PRM/BS placement'''
  * What to do before the SRM/PRM/BS placement?
  * TT
Line 33: Line 36:
 * Green installation  * '''Green installation'''
Line 43: Line 46:
== RF team ==

---------

40m upgrade installation plan

Main optics team

  • Vent

    • What to do before the vent?
    • Tuning of the MC servo ~ low power MC test
    • ITM pointing preparations? (green/red pointers at the both ends)
    • ITM pointing preparations? (green/red pointers at the both ends)
  • ITM placement

    • What to do before the ITM placement?
    • Suspension assembly
      • Gluing test
      • Optics cleaning
      • Gluing (magnets/standoffs/guide rods)
      • Suspending
    • procedure
  • MMT placement

    • What to do before the MMT placement?
    • Optics delivery (Shipping Feb 25) / baking
  • Initial Pointing adjustment

  • SRM/PRM/BS placement

    • What to do before the SRM/PRM/BS placement?
    • TT
  • Closing up the vacuum


Green team

  • Green installation


CDS team


RF team


PSL table upgrade

  • Laser delivery (done)