Differences between revisions 2 and 8 (spanning 6 versions)
Revision 2 as of 2010-02-12 00:55:35
Size: 642
Editor: KojiArai
Comment:
Revision 8 as of 2010-02-13 03:43:13
Size: 1452
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Vent  * '''Pre-vent works'''
  * Tuning of the MC servo ~ low power MC test
  * End transmon X/Y Optics relocations (before the vent) for green
  * ITM pointing preparations? (green/red pointers at the both ends)

 * '''Vent'''
Line 7: Line 12:
  * low power MC test   * Tuning of the MC servo ~ low power MC test
  * ITM pointing preparations? (green/red pointers at the both ends)
Line 9: Line 15:
 * ITM placement  * '''ITM placement'''
Line 18: Line 24:
 * MMT placement  * '''MMT placement'''
Line 22: Line 28:
 * SRM/PRM/BS placement  * '''Initial Pointing adjustment'''

 * '''SRM/PRM/BS placement'''
  * What to do before the SRM/PRM/BS placement?
  * TT
Line 30: Line 40:
* Green installation
 * ''' before vent'''
   * relocation of existing optics at the end table -''take 1.5day''
 * '''during vent'''
   * set up the green stuff onto the end table
   * align the green laser to the cavity (how to ?)
   * mode matching of the green laser to the cavity
 * ''' after closing the tanks'''
   * recover IP-ANG and optical levers
Line 36: Line 52:
*  *

---------

== RF team ==
Line 42: Line 62:
*  * Laser delivery (done)
 *

40m upgrade installation plan

Main optics team

  • Pre-vent works

    • Tuning of the MC servo ~ low power MC test
    • End transmon X/Y Optics relocations (before the vent) for green
    • ITM pointing preparations? (green/red pointers at the both ends)
  • Vent

    • What to do before the vent?
    • Tuning of the MC servo ~ low power MC test
    • ITM pointing preparations? (green/red pointers at the both ends)
  • ITM placement

    • What to do before the ITM placement?
    • Suspension assembly
      • Gluing test
      • Optics cleaning
      • Gluing (magnets/standoffs/guide rods)
      • Suspending
    • procedure
  • MMT placement

    • What to do before the MMT placement?
    • Optics delivery (Shipping Feb 25) / baking
  • Initial Pointing adjustment

  • SRM/PRM/BS placement

    • What to do before the SRM/PRM/BS placement?
    • TT
  • Closing up the vacuum


Green team

  • before vent

    • relocation of existing optics at the end table -take 1.5day

  • during vent

    • set up the green stuff onto the end table
    • align the green laser to the cavity (how to ?)
    • mode matching of the green laser to the cavity
  • after closing the tanks

    • recover IP-ANG and optical levers


CDS team


RF team


PSL table upgrade

  • Laser delivery (done)

Upgrade_09/Installation_Plan (last edited 2012-01-03 23:02:40 by localhost)