Size: 642
Comment:
|
Size: 1137
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| * Vent | * '''Pre-vent works''' * Tuning of the MC servo ~ low power MC test * End transmon X/Y Optics relocations (before the vent) for green * ITM pointing preparations? (green/red pointers at the both ends) * '''Vent''' |
| Line 7: | Line 12: |
| * low power MC test | * Tuning of the MC servo ~ low power MC test * ITM pointing preparations? (green/red pointers at the both ends) |
| Line 9: | Line 15: |
| * ITM placement | * '''ITM placement''' |
| Line 18: | Line 24: |
| * MMT placement | * '''MMT placement''' |
| Line 22: | Line 28: |
| * SRM/PRM/BS placement | * '''Initial Pointing adjustment''' * '''SRM/PRM/BS placement''' * What to do before the SRM/PRM/BS placement? * TT |
| Line 30: | Line 40: |
| * Green installation | * '''Green installation''' |
| Line 36: | Line 46: |
| * | * --------- == RF team == |
| Line 42: | Line 56: |
| * | * Laser delivery (done) * |
40m upgrade installation plan
Main optics team
Pre-vent works
- Tuning of the MC servo ~ low power MC test
- End transmon X/Y Optics relocations (before the vent) for green
- ITM pointing preparations? (green/red pointers at the both ends)
Vent
- What to do before the vent?
- Tuning of the MC servo ~ low power MC test
- ITM pointing preparations? (green/red pointers at the both ends)
ITM placement
- What to do before the ITM placement?
- Suspension assembly
- Gluing test
- Optics cleaning
- Gluing (magnets/standoffs/guide rods)
- Suspending
- procedure
MMT placement
- What to do before the MMT placement?
- Optics delivery (Shipping Feb 25) / baking
Initial Pointing adjustment
SRM/PRM/BS placement
- What to do before the SRM/PRM/BS placement?
- TT
- Closing up the vacuum
Green team
Green installation
CDS team
RF team
PSL table upgrade
- Laser delivery (done)