Line 8: Line 8:
  * ITM pointing preparations? (green pointers at the both ends)
Line 22: Line 23:
 * Initial Pointing adjustment
Line 30: Line 33:
* Green installation  * Green installation
Line 36: Line 39:
*  *
Line 42: Line 45:
*  * Laser delivery (done)
 *

40m upgrade installation plan

Main optics team

  • Vent
    • What to do before the vent?
    • low power MC test
    • ITM pointing preparations? (green pointers at the both ends)
  • ITM placement
    • What to do before the ITM placement?
    • Suspension assembly
      • Gluing test
      • Optics cleaning
      • Gluing (magnets/standoffs/guide rods)
      • Suspending
    • procedure
  • MMT placement
    • What to do before the MMT placement?
    • Optics delivery (Shipping Feb 25) / baking
  • Initial Pointing adjustment
  • SRM/PRM/BS placement
  • Closing up the vacuum


Green team

  • Green installation


CDS team


PSL table upgrade

  • Laser delivery (done)