Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2010-02-12 00:55:19
Size: 635
Editor: KojiArai
Comment:
Revision 5 as of 2010-02-12 04:51:52
Size: 993
Editor: KojiArai
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
* Vent  * '''Vent'''
Line 7: Line 7:
  * low power MC test   * Tuning of the MC servo ~ low power MC test
  * ITM pointing preparations? (green/red pointers at the both ends)
  * ITM pointing preparations? (green/red pointers at the both ends)
Line 9: Line 11:
* ITM placement  * '''ITM placement'''
Line 17: Line 19:
* MMT placement
 
* '''MMT placement'''
Line 21: Line 24:
* SRM/PRM/BS placement  * '''Initial Pointing adjustment'''
Line 23: Line 26:
* Closing up the vacuum  * '''SRM/PRM/BS placement'''
  * What to do before the SRM/PRM/BS placement?
  * TT

 * Closing up the vacuum
Line 29: Line 36:
* Green installation  * '''Green installation'''
Line 35: Line 42:
*  *

---------

== RF team ==
Line 41: Line 52:
*  * Laser delivery (done)
 *

40m upgrade installation plan

Main optics team

  • Vent

    • What to do before the vent?
    • Tuning of the MC servo ~ low power MC test
    • ITM pointing preparations? (green/red pointers at the both ends)
    • ITM pointing preparations? (green/red pointers at the both ends)
  • ITM placement

    • What to do before the ITM placement?
    • Suspension assembly
      • Gluing test
      • Optics cleaning
      • Gluing (magnets/standoffs/guide rods)
      • Suspending
    • procedure
  • MMT placement

    • What to do before the MMT placement?
    • Optics delivery (Shipping Feb 25) / baking
  • Initial Pointing adjustment

  • SRM/PRM/BS placement

    • What to do before the SRM/PRM/BS placement?
    • TT
  • Closing up the vacuum


Green team

  • Green installation


CDS team


RF team


PSL table upgrade

  • Laser delivery (done)