Size: 635
Comment:
|
Size: 771
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| * Vent | * Vent |
| Line 8: | Line 8: |
| * ITM pointing preparations? (green pointers at the both ends) | |
| Line 9: | Line 10: |
| * ITM placement | * ITM placement |
| Line 17: | Line 18: |
| * MMT placement | * MMT placement |
| Line 21: | Line 23: |
| * SRM/PRM/BS placement | * Initial Pointing adjustment |
| Line 23: | Line 25: |
| * Closing up the vacuum | * SRM/PRM/BS placement * Closing up the vacuum |
| Line 29: | Line 33: |
| * Green installation | * Green installation |
| Line 35: | Line 39: |
| * | * |
| Line 41: | Line 45: |
| * | * Laser delivery (done) * |
40m upgrade installation plan
Main optics team
- Vent
- What to do before the vent?
- low power MC test
- ITM pointing preparations? (green pointers at the both ends)
- ITM placement
- What to do before the ITM placement?
- Suspension assembly
- Gluing test
- Optics cleaning
- Gluing (magnets/standoffs/guide rods)
- Suspending
- procedure
- MMT placement
- What to do before the MMT placement?
- Optics delivery (Shipping Feb 25) / baking
- Initial Pointing adjustment
- SRM/PRM/BS placement
- Closing up the vacuum
Green team
- Green installation
CDS team
PSL table upgrade
- Laser delivery (done)