Line 5: Line 5:
* Vent  * Vent
Line 9: Line 9:
* ITM placement  * ITM placement
Line 17: Line 17:
* MMT placement
 
* MMT placement
Line 21: Line 22:
* SRM/PRM/BS placement  * SRM/PRM/BS placement
Line 23: Line 24:
* Closing up the vacuum  * Closing up the vacuum

40m upgrade installation plan

Main optics team

  • Vent
    • What to do before the vent?
    • low power MC test
  • ITM placement
    • What to do before the ITM placement?
    • Suspension assembly
      • Gluing test
      • Optics cleaning
      • Gluing (magnets/standoffs/guide rods)
      • Suspending
    • procedure
  • MMT placement
    • What to do before the MMT placement?
    • Optics delivery (Shipping Feb 25) / baking
  • SRM/PRM/BS placement
  • Closing up the vacuum


Green team

* Green installation


CDS team

*


PSL table upgrade

*