Agenda
- Current Status / Recent Work B. Upgrade Plans
II. Recent Status
- Personnel Changes
- Rob Ward: 1/2004 - 3/2010 (gone to Paris - APC / Barsuglia)
III. Upgrade
- Purpose of the upgrade
- AdvLIGO LSC / AdVLIGO testbed (green/CDS)
- Advanced techniques
- Current status of the upgrade preparation
- Mechanics -
- Done: SOSs for new, light test masses
- Done: TT suspensions for PRC
- ANU tip/tilt: LLO Blades + TAMA/ANU compliant eddy current damping
- Done: In-vac mounts for green
- To be done: Supplimental parts for TTs, some in-vac mechanics
- Optics
- Done: Have the SRM / ITMs (dichroic). PRMs polished - coating waits for arm loss measurement
- Done: optical layout
- MMT design (Jenne): histograms, alignment orthogonality
Optics - Gooch & Housego magic HR
Done: smaller aux optics, folding mirrors (G&H), and green mirrors, all in hand
- In progress: ETMs are being polished / coated. ETD = September
- Electronics (RF system)
- Done: Designed the multiple frequency RF system to preserve the phase noise performance of the oscillator
- RF signal distribution (oscillators, splitters, amplifiers, etc.)
- Triple-Resonant EOM (New Focus KTP + resonant circuit)
- 5 of 10 PDs tuned, characterized and made shot noise limited
- To be done: Finish the remaining 5 PDs / Install the photodiodes on the tables
- Done: Designed the multiple frequency RF system to preserve the phase noise performance of the oscillator
- Green beam injection (unstabilized fiber + green injection from the ends)
- Done: End table constructed / fringe lock achieved
- CDS -
- Done: Demonstrated the control system of one suspension including the cavity lock.
- Layout diagram
- 90% of H/Ws at the 40m
- To be done: Integration of the system
- Local control tests
- Integration tests
- Done: Demonstrated the control system of one suspension including the cavity lock.
- PSL laser/table upgrade
- Mechanics -
- Upgrade Plans
- upgrading order and rough schedule
IV. End