Jan 2011 Meeting of the 40m Technical Advisory Committee
Jan ..., 2011 BR 9:00 AM PDT BR Call in instructions:BR (866) 380 - 5536BR International: (816) 249 - 4731BR Code: 6263958709BR
Agenda
- Current Status / Recent Work B. Upgrade Plans
II. Recent Status
- Personnel Changes
- Alberto submitted his thesis:
[http://www.ligo.caltech.edu/docs/P/P010009-00.pdf Alberto's Thesis]
III. Upgrade
- Objectives of the 40m lab
- testbed for AdvLIGO LSC / AdVLIGO (green/CDS)
- platform for developing Advanced techniques
- Current status of the upgrade preparation
- Optics and Suspensions
- Done: All optics suspended and installed in the vacuum chamber
- Done: ITMs and ETMs are dichroic (details?)
- Done: New optical layout in place
- Electronics (RF system)
- Under construction: Multiple frequency RF generator to preserve the phase noise performance of the oscillator
- Under construction: RF signal distribution (oscillators, splitters, amplifiers, etc.)
- Done: Triple-Resonant EOM (New Focus KTP + resonant circuit) requires further improvement
- To be done: Finish the PDs / Install the photodiodes on the tables
- Green beam injection
- Done: x-end NPRO locked to the X-arm
- Done: Beat note between PSL and X-end_NPRO observed
- Very close to stabilising the beat note by acting on the end-laser temperature
- CDS -
- PSL laser/table upgrade
- Done: Table raised and all optics re-positioned in accordance with the new optical layout
- Optics and Suspensions
- Upgrade Plans
- upgrading order and rough schedule
IV. End