Line 18: Line 18:
 A. Purpose of the upgrade
  1. AdvLIGO LSC / AdVLIGO testbed (green/CDS)
  1. Advanced techniques
 A. Objectives of the 40m lab
  1. testbed for AdvLIGO LSC / AdVLIGO (green/CDS)
  1. platform for developing Advanced techniques

Jan 2011 Meeting of the 40m Technical Advisory Committee

Jan ..., 2011 BR 9:00 AM PDT BR Call in instructions:BR (866) 380 - 5536BR International: (816) 249 - 4731BR Code: 6263958709BR


  1. Agenda

  2. Current Status / Recent Work B. Upgrade Plans

II. Recent Status

  1. Personnel Changes
    1. Alberto submitted his thesis:
    2. [http://www.ligo.caltech.edu/docs/P/P010009-00.pdf Alberto's Thesis]

III. Upgrade

  1. Objectives of the 40m lab
    1. testbed for AdvLIGO LSC / AdVLIGO (green/CDS)
    2. platform for developing Advanced techniques
  2. Current status of the upgrade preparation
    1. Optics and Suspensions
      • Done: All optics suspended and installed in the vacuum chamber
      • Done: ITMs and ETMs are dichroic (details?)
      • Done: New optical layout in place
    2. Electronics (RF system)
      • Under construction: Multiple frequency RF generator to preserve the phase noise performance of the oscillator
      • Under construction: RF signal distribution (oscillators, splitters, amplifiers, etc.)
      • Done: Triple-Resonant EOM (New Focus KTP + resonant circuit) requires further improvement
      • To be done: Finish the PDs / Install the photodiodes on the tables
    3. Green beam injection
      • Done: x-end NPRO locked to the X-arm
      • Done: Beat note between PSL and X-end_NPRO observed
      • Very close to stabilising the beat note by acting on the end-laser temperature
    4. CDS -
    5. PSL laser/table upgrade
      • Done: Table raised and all optics re-positioned in accordance with the new optical layout
  3. Upgrade Plans
    1. upgrading order and rough schedule

IV. End