Feb 10th, 2011 Meeting of the 40m Technical Advisory Committee
Link to the slides https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=33398
I. Personnel
- Current members
Alberto submitted his thesis: https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/thesis/main/
- Suresh joined the team
- Jamie is coming (Feb)
II. Overview of the presentation
- Current Status
Under each subsystem (IFO&SUS, RF, LSC, CDS) we discuss
- An overview of the subsystem
- Work completed since last TAC
- Work in progress just now
- Future projects
- Compare and contrast the features of the 40m vs (LHO and LLO)
- Outline projects which are planned for the near future (6 months)
- Specific deliverables where ever possible.
III. Current Status / Recent and Ongoing Work for each subsystem
- Optics and Suspensions
- An overview of the new optical layout (high lighting the differences from the previous plan)
- ITMs and ETMs are dichroic, mass/finesse chosen such that the radiation pressure effects are comparable to Adv
- PRC is resonant with 11MHz, 55MHz and the carrier (PSL)
- SRC is resonant with 55MHz
- Additional optics installed to route the green beam from the end tables to the PSL table
- Tip-tilts are installed with new suspensions: some characterisation remains
- Status:
- PSL table raised
- All optics suspended and installed according to the new plan in the vacuum chamber
- The chamber has been evacuated and has reached operational vacuum pressure
- An overview of the new optical layout (high lighting the differences from the previous plan)
- Length Sensing and Control
- An overview of the
- Current status
- PSL locked to MC length (in IR)
- MC length locked to beat-note frequency (in green)
- X-end laser frequency locked to X-arm length (in IR)
- Single-mode fiber brings X-end NPRO light to the PSL table for IR beat
- Work in progress:
- Measurement of the coherence of the two lasers when locked to the arm cavity
- Acquiring a deterministic lock
- Electronics (RF system)
- An overview of the new RF system
- The layout and the measurement scheme
- Status
- Under construction: Multiple frequency RF generator to preserve the phase noise performance of the oscillator
- Under construction: RF signal distribution (oscillators, splitters, amplifiers, etc.)
- Done: Triple-Resonant EOM (New Focus KTP + resonant circuit) prototype completed
- To be done: Finish the PDs / Install the photodiodes on the tables; characterisation of all the PDs underway
- An overview of the new RF system
- Control and Data Systems
- Done: All of the new CDS hardware installed
- All 5 IO chassis and computers installed: c1lsc, c1sus, c1ioo, c1iscex, c1iscey
- New frame builder computer and code running, recording, and serving data
- Done: Local damping has been achieved on all suspended optics with the new CDS system
- Done: Have working reflected memory networks communicating between computers
- Both old GE Fanuc and the new Dolphin PCIE reflected memory networks installed
- Done: All of the new CDS hardware installed
IV. Future Projects
- Comparison of the 40m and the LHO/LLO instruments
- Length Sensing and Control
- Deterministic lock acquisition through auxiliary green laser locking
- Locking sequences: successively increasing the length of the primary length reference
- Coherent lock of the three lasers (PSL and two auxiliary lasers)
- Dither beam alignment
- CDS
- To be done: Finish setting up the LSC controls
- To be done: Integrate green locking into the digital controls system
- Realize the idea of "simulated plant"
- Adaptive seismic noise cancellation
- seismometers are back in action installed near the 40m arms
- determination of the transfer function matrices
- closing the feedforward loops to arm cavities
- implementing the algorithms in CDS
V. End