|
Size: 1192
Comment:
|
Size: 114
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here. == PR/DR MI commissioning == * PRMI locked! * Investigate triggering (trigger on POP110 instead?) * What is the correct normalization? * Finish updating IFO configure scripts (Jamie) * OSA modulation depth measurements at: * REFL * AS * Power budget at all available ports, include 1f(22)/2f(110) * PRC gain * Oplev calibration (BS? PRM?) * Sensing matrix * Cavity length (use new Anamaria method) * Loop gain (make sure loop is stable for measurements) * Noise budget * Full Finesse model. * Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate) == End table upgrade == [[endtable_upgrade|Project page]]. * ETMY table must be completed ASAP * What is left to do? * ETMX upgrade needs to be planned/coordinated. == FPMI == == PRFPMI == == DRFPMI == == Next vent == Will need to vent soon to flip SR2. * SR2 flip * Are all black glass beam dumps installed? Longer term: * New OSEM mount screws * New periscope plate |
[[Project_Planning_2021 | 2021 Planning]] [[Project_Planning_Pre_2017| Pre-2017 Planning]] |
