Line 3: Line 3:
This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.

== Finishing in-vac work ==
We need to try to get this finished by the END OF THIS WEEK (1/18/2013).

 * Finish TT installation
 * Recover full alignment
 * Lock PRC
 * Extract sensor card, allen key, ants from chamber before closing

== PR/DR MI commissioning ==
This is primary goal. We need to have this working by the end of the
month (1/13).

 * Lock both arms and optimally align
   * Center spots on the ITMs
 * Lock the PRMI
 * PRMI measurements:

   * Good camera images:
     * REFL
     * AS
     * POP - improve this camera. Expand the beam, and adjust the brightness
     * PR/BS face - get these hooked up

   * OSA
     * REFL
     * AS

   * Power budget at all available ports, include 1f(22)/2f(110)
     * PRC gain

   * Sensing matrix
   * Cavity length (use new Anamaria method)
   * Loop gain (make sure loop is stable for measurements)
   * Noise budget

 * Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

== Full IFO Locking ==

Roughly three months.

== End table upgrade ==

[[endtable_upgrade|Project page]].
On best-effort basis, although we'll need to coordinate exactly when we
do the end-table swap out.

== Things to prepare for next vent ==

We have no immediate plan to vent in the near future, but I'm going to
be checking on progress of this stuff weekly:

 * New TT risers
 * Black glass beam dumps
 * New OSEM mount screws
 * New periscope plate