This Page describes the forward plans and measurements to do with DC Readout/OMC at the 40m.

Re-establish the IFO state (ie, get back to where we were with respect to RF locking)

Tweak the input mode matching telescope, to match the input mode to the average of the two arms rather than just the x-arm, as it is now.

Test/familiarize the new digital controls systems:

Commission the OMC

Commission DC Readout

Comission DC ASC for full IFO

Squeezing injection optics installation and checkout.

Planned_Measurements_and_Procedures (last edited 2012-01-03 23:02:37 by localhost)