Jenne's To Do List
Jenne has waaay too many things to do. Here is a summary:
PMC
- Use Altium to design a new PMC circuit board. Get it made.
Mode Cleaner
Online Adaptive Filtering (OAF)
- Make it work again after the upgrade.
Wiener Filtering Paper
- Finish the damn plots.
- Add a short section about the seismometers, and how we can't do better than we are, with the sensors that we have.
- Polish it up a little, then send it out for review.
Feed Forward Paper
- Make a plot of then / now. Send it to Ryan.
Seismic Simulations
- Take a more thorough look at reflections simulation. What does it mean?
- What is the next step?
- Sum up a bunch of different wavelength scattering simulations, to simulate a ~square building.
- Repeat scattering stuff for incident Rayleigh waves.
- Want to know ratios of inc. waves to outgoing waves, for all combos of inc. and out. waves. This is to figure out where the energy is going.
Guralp Seismometers
- Use Altium to remake the Guralp breakout box. Make it less crappy this time.
- Get the channels acquired!
Planning for the future
- Write 2 year plan for the seismology stuff.
40m Suspensions
- Put ETMX back in tower.
- Scrub glue off of ETMY, reglue.
- Suspend ETMY, balance, bake, resuspend.
Tip Tilts
- Shake test / transfer functions for spare TT
40m Backup
- Figure out WTF Dan is up to, and why it's not done yet.