Rough Sketch of a Schedule

DC Readout Phase A

Mid Oct06 - Valentines Day 07

  • Lock OMC Length loop
  • Lock OMC Alignment loops
  • Characterize in-vac DC PDs
  • DC v. RF Displacement sensitivity with a Simple Michelson
  • DC v. RF Displacement sensitivity with PR - FPMI
  • Commission SUS Dewhitening filters on ITMs and ETMs

Power-Recycled Fabry-Perot Michelson - Locking

Nov 1 - Jan 15th

  • SMOOTH Locking (e.g. variable Finesse, guided lock, etc, etc.)
  • Characterize noise (roughly)
  • DC v. RF noise couplings AM, FM, PM, etc.

DRSE Lock Acquisition

Mid Oct - Jan 1st

  • Re-establish pre-vent lock acquisition
  • Common Mode Servo (new)
  • Reduce and remove CARM offset
  • Re-measure optical spring
  • Full LSC characterization

DC Readout Phase B

March 1, 2007 - April 1, 2007

  • DC Readout with DRSE
  • New hardware ?


New LSC / ASC Modulation/Locking Schemes

Install by June 1, 2007

  • Develop and select a feasible AdvLIGO LSC/ASC scheme
  • Adapt to the 40m
  • Write a document on it
  • Install June 1st