Differences between revisions 1 and 15 (spanning 14 versions)
Revision 1 as of 2011-06-03 01:40:59
Size: 601
Editor: RanaAdhikari
Comment:
Revision 15 as of 2011-11-05 00:56:52
Size: 1321
Editor: KojiArai
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
<<TableOfContents(2)>>

----
Line 4: Line 8:
 * [[/REFL11|REFL11]]
 * [[/REFL33|REFL33]]
 * [[/REFL55|REFL55]]
 * [[/REFL165|REFL165]]
 * [[/AS55|AS55]]
 * [[/POX11|POX11]]
 * [[/POY11|POY11]]
 * [[/POP22_110|POP22/POP110]]
 * [[/POP55|POP55]]
Line 5: Line 18:
|| || 11 MHz || 22 MHz || 29.5 MHz || 33 MHz || 55 MHz || 110 MHz ||
|| AS || [[/AS11]] || || || || || ||
|| REFL || || || || || || ||
|| POP || || || || || || ||
|| POY || || || || || || ||
|| MCREFL || || || || || || ||
----


== Documentation ==

In [https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/RFPDupgradeProcedure/RFPDupgradeProcedure.pdf this document] I explain all the steps of the 40m RF PD upgrade process.

Some notes from Hartmut's commissioning of this PD in 2004 in the elog entries:

 * [http://www.ldas-sw.ligo.caltech.edu/ilog/pub/ilog.cgi?group=40m&task=view&date_to_view=11/02/2004&anchor_to_scroll_to=2004:11:02:14:43:23-hartmut 11/02/2004]
 * [http://www.ldas-sw.ligo.caltech.edu/ilog/pub/ilog.cgi?group=40m&task=view&date_to_view=11/12/2004&anchor_to_scroll_to=2004:11:12:13:51:23-hartmut 11/12/2004]

TODO: Make label stickers for each photodiode, with:

 * optical response
 * resonant frequency
 * transimpedance
 * resonance Q
 * shot noise 3dB point current
 * notes

= Misc. =
[attachment:2010-05-03_JenneLaserCalibration_0dBm_NDfilter.png]

[attachment:40mRFPDupgradeProcess.pdf]


RF Photodetectors

This page (and only this page) contains all of the RF Photodetector data for the 40m. If you find pages elsewhere in this wiki, move them here.


Documentation

In [https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/RFPDupgradeProcedure/RFPDupgradeProcedure.pdf this document] I explain all the steps of the 40m RF PD upgrade process.

Some notes from Hartmut's commissioning of this PD in 2004 in the elog entries:

TODO: Make label stickers for each photodiode, with:

  • optical response
  • resonant frequency
  • transimpedance
  • resonance Q
  • shot noise 3dB point current
  • notes

Misc.

[attachment:2010-05-03_JenneLaserCalibration_0dBm_NDfilter.png]

[attachment:40mRFPDupgradeProcess.pdf]

Electronics/RFPD (last edited 2023-05-24 19:28:32 by YutamichimuraATligoDOTorg)