Differences between revisions 15 and 16
Revision 15 as of 2009-12-17 07:55:26
Size: 1592
Editor: KiwamuIzumi
Comment:
Revision 16 as of 2009-12-17 22:28:08
Size: 1659
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:

 .

'''Conceptual idea'''

'''Transformer
'''

'''Loss effect
'''
Line 32: Line 42:

Overview

  • A set of phase modulation sidebands are imposed to the main laser beam for control of the mode cleaner cavity and the main interferometer. The frequency of the sidebands are determined from the signal extraction and control scheme: 11MHz, 23.5MHz, and 55MHz.
  • We are investigating a multiply resonant circuit to be attached to EOM in order to create those three pairs of sidebands with a single crystal.
  • (What is motivation? Why single crystal? Why three eoms are not enough? Why triple electrode EOM is not enough?)
  • The feasibility and the basic ideas of the triple resonant circuit was investigated by Stephanie Erickson, a 40m SURF student in 2009 Summer. Link to Stephanie's descriptions (What did she demonstrated?)

Conceptual idea

Transformer

Loss effect

Steps for Development

  • studying the principle of LC circuit + transformer {OK}

  • investigation of loss effect in LC circuit {OK}

  • make a test circuit (single resonant) with highest impedance ( - Dec.20)
  • make a new transformer for matching the impedance of the test circuit ( - Dec. 25)
  • performance test by using optical spectrum analyzer ( - Dec. 31)
  • study of triple resonant circuit (- Jan.5)
  • investigation of loss effect in the multi-resonant circuit ( - Jan.12)
  • make a prototype circuit with highest impedance ( - Jan.13)
  • make a new transformer for prototype ( - Jan. 20)
  • performance test of prototype by optical analyzer ( - Jan. 25)
  • final design and ordering (- Jan.31)
  • performance test with ordered circuit
  • installation

Electronics/Multi_Resonant_EOM (last edited 2017-01-25 22:48:38 by GautamvenugopalanATligoDOTorg)