|
Size: 1633
Comment:
|
Size: 1990
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 2: | Line 2: |
== Major Missions == . Binary Outputs . RFM . Simulated plant for Green locking |
|
| Line 36: | Line 43: |
| . Put time line schedule here. | |
| Line 40: | Line 48: |
| = DETAILED CONSIDERATION = | = DETAILED CONSIDERATIONs = |
| Line 43: | Line 51: |
| Do we have sufficient number of cables ? | . Do we have sufficient number of the cables ? . Let's doublecheck it. |
| Line 50: | Line 59: |
| . How to make a bitwise . relation with the control filter modules |
|
| Line 54: | Line 66: |
. What is the temporary configuration ? . What is the final configuration ? |
|
| Line 60: | Line 76: |
| . Concept . Model construction |
September CDS plan
Major Missions
- Binary Outputs
- RFM
- Simulated plant for Green locking
PLANS
TO DO LIST
attachment:green.png complete
attachment:orange.png intermediate state
attachment:red.png incomplete
attachment:black.png gave up
- attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
- attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
- attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
- attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
- attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
TIME LINE SCHEDULE
- Put time line schedule here.
DETAILED CONSIDERATIONs
Cable Requirements
- Do we have sufficient number of the cables ?
- Let's doublecheck it.
Notes about Binary Outputs
- How to make a bitwise
- relation with the control filter modules
Reflective Memory Network
- What is the temporary configuration ?
- What is the final configuration ?
Simulated Plant for Green locking
- Concept
- Model construction
