Differences between revisions 6 and 8 (spanning 2 versions)
Revision 6 as of 2010-09-07 18:43:49
Size: 1633
Editor: KiwamuIzumi
Comment:
Revision 8 as of 2010-09-07 18:47:40
Size: 1989
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

== Major Mission ==

 . Binary Outputs
 . RFM
 . Simulated plant for Green locking
Line 36: Line 43:
 . Put time line schedule here.
Line 40: Line 48:
= DETAILED CONSIDERATION = = DETAILED CONSIDERATIONs =
Line 43: Line 51:
Do we have sufficient number of cables ?  . Do we have sufficient number of the cables ?
 . Let's doublecheck it.
Line 50: Line 59:
 . How to make a bitwise
 . relation with the control filter modules
Line 54: Line 66:

 . What is the temporary configuration ?

 . What is the final configuration ?
Line 60: Line 76:
 . Concept
 
 . Model construction

September CDS plan

Major Mission

  • Binary Outputs
  • RFM
  • Simulated plant for Green locking

BR BR

PLANS

TO DO LIST

  • attachment:green.png complete

    attachment:orange.png intermediate state

    attachment:red.png incomplete

    attachment:black.png gave up

  • attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
  • attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
  • attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
  • attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
  • attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).

BR BR

TIME LINE SCHEDULE

  • Put time line schedule here.

BR BR


DETAILED CONSIDERATIONs

Cable Requirements

  • Do we have sufficient number of the cables ?
  • Let's doublecheck it.

BR BR

Notes about Binary Outputs

  • How to make a bitwise
  • relation with the control filter modules

BR BR

Reflective Memory Network

  • What is the temporary configuration ?
  • What is the final configuration ?

BR BR

Simulated Plant for Green locking

  • Concept
  • Model construction

BR BR

CDS/September_CDS_plan (last edited 2012-01-03 23:02:37 by localhost)