== Major Missions ==

 . {*} Make the Binary Outputs work on C1SUS and damp the vertex suspensions
 . {*} Make the Reflective Memory Network work
 . {*} Simulated plant for Green locking
Line 10: Line 17:
 . attachment:orange.png Binary Output working (Alex/Joe) 1-2 days  . ''' Binary Output working on c1sus (Alex/Joe) 1-2 days '''
   . attachment:orange.png test all the BO channels and their assignments
   . attachment:red.png Switching over cabling from the current XY220's to the new system
Line 12: Line 21:
 . attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
  
 . attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
 . ''' Complete suspension damping keeping in mind Version B coils. (1-2 days?) '''
   . attachment:green.png damping all the vertex suspensions with the new CDS
   . attachment:red.png check if the binary outputs are working
Line 16: Line 25:
 . attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).  . ''' Get RFM working! (We have new parts and need new IPC parser) (3-4 days) '''
   . attachment:green.png string the RFM optical fiber connecting C1SUS and C1ISCEX
   . attachment:orange.png install PCI-5565 driver on c1sus
   . attachment:red.png install PCI-5565 driver on c1iscex
   . attachment:red.png test the RFM card by running the diagnostic script on the individually
   . attachment:red.png test the RFM with the epics
Line 18: Line 32:
 . attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
Line 20: Line 33:
 . attachment:red.png Simulated Green Locking.  . ''' Get both end stations working '''
   . attachment:red.png Check we have correct number of cables (againi tomorrow).
   . attachment:red.png Check if both end stations are correctly running

 . ''' Get IOO front end machine working '''
   . attachment:red.png Get thing computer into 1X1 or 1X2 rack
   . attachment:red.png get IO chassis into 1X1 or 1X2 working. (5 days)
Line 22: Line 41:
 . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).  . ''' Simulated Green Locking '''
   . attachment:red.png conceptual design
   . attachment:red.png make realtime simlink model
   . attachment:red.png compile and install the model
Line 24: Line 46:
 . attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.  . ''' LSC simulated plant '''
   . attachment:green.png conceptual design
   . attachment:green.png make realtime simlink model
   . attachment:orange.png compile and install the model
Line 26: Line 51:
 . attachment:red.png Simulated Green Locking.  . ''' Fix non-working IO chassis '''
   . attachment:red.png Check on fiber with Rolf for LSC
   . attachment:red.png time
 
 
 . ''' Gentoo patch '''
   . not high priority - unless they stop making backwards compatibility - do it when we have time
Line 28: Line 59:
 . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).

 . attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
Line 36: Line 64:
 . Put time line schedule here.
Line 40: Line 69:
= DETAILED CONSIDERATION = = DETAILED CONSIDERATIONs =
Line 43: Line 72:
Do we have sufficient number of cables ?  . Do we have sufficient number of the cables ?
 . Let's doublecheck it.
Line 50: Line 80:
 . How to make a bitwise
 . relation with the control filter modules
Line 54: Line 87:

 . What is the temporary configuration ?

 . What is the final configuration ?
Line 60: Line 97:
 . Concept
 
 . Model construction

September CDS plan

Major Missions

  • {*} Make the Binary Outputs work on C1SUS and damp the vertex suspensions

  • {*} Make the Reflective Memory Network work

  • {*} Simulated plant for Green locking

BR BR

PLANS

TO DO LIST

  • attachment:green.png complete

    attachment:orange.png intermediate state

    attachment:red.png incomplete

    attachment:black.png gave up

  • Binary Output working on c1sus (Alex/Joe) 1-2 days

    • attachment:orange.png test all the BO channels and their assignments
    • attachment:red.png Switching over cabling from the current XY220's to the new system
  • Complete suspension damping keeping in mind Version B coils. (1-2 days?)

    • attachment:green.png damping all the vertex suspensions with the new CDS
    • attachment:red.png check if the binary outputs are working
  • Get RFM working! (We have new parts and need new IPC parser) (3-4 days)

    • attachment:green.png string the RFM optical fiber connecting C1SUS and C1ISCEX
    • attachment:orange.png install PCI-5565 driver on c1sus
    • attachment:red.png install PCI-5565 driver on c1iscex
    • attachment:red.png test the RFM card by running the diagnostic script on the individually
    • attachment:red.png test the RFM with the epics
  • Get both end stations working

    • attachment:red.png Check we have correct number of cables (againi tomorrow).
    • attachment:red.png Check if both end stations are correctly running
  • Get IOO front end machine working

    • attachment:red.png Get thing computer into 1X1 or 1X2 rack
    • attachment:red.png get IO chassis into 1X1 or 1X2 working. (5 days)
  • Simulated Green Locking

    • attachment:red.png conceptual design
    • attachment:red.png make realtime simlink model
    • attachment:red.png compile and install the model
  • LSC simulated plant

    • attachment:green.png conceptual design
    • attachment:green.png make realtime simlink model
    • attachment:orange.png compile and install the model
  • Fix non-working IO chassis

    • attachment:red.png Check on fiber with Rolf for LSC
    • attachment:red.png time
  • Gentoo patch

    • not high priority - unless they stop making backwards compatibility - do it when we have time

BR BR

TIME LINE SCHEDULE

  • Put time line schedule here.

BR BR


DETAILED CONSIDERATIONs

Cable Requirements

  • Do we have sufficient number of the cables ?
  • Let's doublecheck it.

BR BR

Notes about Binary Outputs

  • How to make a bitwise
  • relation with the control filter modules

BR BR

Reflective Memory Network

  • What is the temporary configuration ?
  • What is the final configuration ?

BR BR

Simulated Plant for Green locking

  • Concept
  • Model construction

BR BR