== Major Missions == . {*} Make the Binary Outputs work on C1SUS and damp the vertex suspensions . {*} Make the Reflective Memory Network work . {*} Simulated plant for Green locking |
|
| Line 11: | Line 18: |
| . attachment:orange.png test all the BO channels and their assignments . attachment:red.png switch |
|
| Line 36: | Line 44: |
| . Put time line schedule here. | |
| Line 40: | Line 49: |
| = DETAILED CONSIDERATION = | = DETAILED CONSIDERATIONs = |
| Line 43: | Line 52: |
| Do we have sufficient number of cables ? | . Do we have sufficient number of the cables ? . Let's doublecheck it. |
| Line 50: | Line 60: |
| . How to make a bitwise . relation with the control filter modules |
|
| Line 54: | Line 67: |
. What is the temporary configuration ? . What is the final configuration ? |
|
| Line 60: | Line 77: |
| . Concept . Model construction |
September CDS plan
Major Missions
Make the Binary Outputs work on C1SUS and damp the vertex suspensions
Make the Reflective Memory Network work
Simulated plant for Green locking
PLANS
TO DO LIST
attachment:green.png complete
attachment:orange.png intermediate state
attachment:red.png incomplete
attachment:black.png gave up
- attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
- attachment:orange.png test all the BO channels and their assignments
- attachment:red.png switch
- attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
- attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
- attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
- attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
TIME LINE SCHEDULE
- Put time line schedule here.
DETAILED CONSIDERATIONs
Cable Requirements
- Do we have sufficient number of the cables ?
- Let's doublecheck it.
Notes about Binary Outputs
- How to make a bitwise
- relation with the control filter modules
Reflective Memory Network
- What is the temporary configuration ?
- What is the final configuration ?
Simulated Plant for Green locking
- Concept
- Model construction