| = TO DO LIST = || attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up|| |
= PLANS = == TO DO LIST == || attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up|| |
| Line 28: | Line 29: |
== TIME LINE SCHEDULE == ----------- = DETAILED CONSIDERATION = == Cable Requirements == Do we have sufficient number of cables ? |
September CDS plan
PLANS
TO DO LIST
attachment:green.png complete
attachment:orange.png intermediate state
attachment:red.png incomplete
attachment:black.png gave up
- attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
- attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
- attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
- attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
- attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
TIME LINE SCHEDULE
DETAILED CONSIDERATION
Cable Requirements
Do we have sufficient number of cables ?