September CDS plan

Major Missions

  • {*} Complete damping of the vertex suspensions

  • {*} Preparation for Green locking

  • {*} Simulated plants

BR BR


PLANS

TO DO LIST

  • attachment:green.png complete

    attachment:orange.png intermediate state

    attachment:red.png incomplete

    attachment:black.png gave up

    BR

  • A. Complete suspension damping keeping in mind Version B coils. (1-2 days?)

    • ADC break out boards

      • attachment:red.png design an adapter box for the breakout boards
      • attachment:red.png make the box and install it
    • Binary Output working on c1sus (Alex/Joe) 1-2 days

      • attachment:orange.png test all the BO channels and their assignments
      • attachment:red.png Switching over cabling from the current XY220's to the new system
    • damping test with the BOs

      • attachment:green.png damping all the vertex suspensions with the new CDS
      • attachment:red.png check if the binary outputs are working
    • refinement of the control model

      • attachment:red.png renewal of realtime control model
      • attachment:red.png renewal of medm screens for the vertex suspensions
    • misc.

      • attachment:red.png fix  feCodeGen.pl  script

BR

  • B. Preparation for Green Locking

    • Get RFM working (3-4 days)

      • attachment:red.png make a new IPC parser
      • attachment:green.png string the RFM optical fiber connecting C1SUS and C1ISCEX
      • attachment:orange.png install PCI-5565 driver on c1sus
      • attachment:red.png install PCI-5565 driver on c1iscex
      • attachment:red.png test the RFM card by running the diagnostic script on the individually
      • attachment:red.png test the RFM with the epics
    • Get both end stations working

      • attachment:red.png Check we have correct number of cables (again tomorrow).
      • attachment:red.png Check if both end stations are correctly running
    • Get IOO front end machine working

      • attachment:red.png Move the computer into 1X2 rack
      • attachment:red.png remove Marconi(?) and put a new IO chassis on 1X2 rack
      • attachment:red.png check timing/ADC/DAC on the IO chassis. And make it works (5 days)
    • Fix non-working IO chassis

      • attachment:red.png Check on fiber with Rolf for LSC
      • attachment:red.png timing/ADC/DAC check

    BR

  • C. Simulated Plant

    • Simulated Green Locking

      • attachment:red.png conceptual design
      • attachment:red.png make realtime simlink model
      • attachment:red.png compile and install the model
    • LSC simulated plant

      • attachment:green.png conceptual design
      • attachment:green.png make realtime simlink model
      • attachment:orange.png compile and install the model
    • Gentoo patch (not high priority)

BR BR

WISH LIST

(not urgent things, but somethings we want to implement at some points)

  • channel wiki

  • wiki hyperlink on a medm screen

TIME LINE SCHEDULE

  • Put time line schedule here.

BR BR


DETAILED CONSIDERATIONs

Cable Requirements

  • Do we have sufficient number of the cables ?
  • Let's doublecheck it.

BR BR

Notes about Binary Outputs

  • To obtain a voltage signal, a pull-up resister and a DC voltage are needed because the signal is generated with a transistor.
  • An easy way to check this BO, one can put a LED as described in the figure below.

    normal operation

    test configuration

    BO_final.png

    BO_test.png

  • A datasheet for the BO card is here attachment:contec32BO.pdf

BR BR

Reflective Memory Network

  • What is the temporary configuration ?
  • What is the final configuration ?

BR BR

Simulated Plant for Green locking

  • Concept
  • Model construction

BR BR