Differences between revisions 3 and 6 (spanning 3 versions)
Revision 3 as of 2010-09-07 18:37:37
Size: 1012
Editor: KiwamuIzumi
Comment:
Revision 6 as of 2010-09-07 18:43:49
Size: 1633
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
= TO DO LIST =
|| attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up||
[[BR]]
[[BR]]

= PLANS =
=
= TO DO LIST ==
 
|| attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up||
Line 8: Line 12:
Complete suspension damping keeping in mind Version B coils. (1-2 days?)  . attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
Line 10: Line 14:
Get RFM working! (We have new parts and need new IPC parser) (3-4 days)  . attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
Line 12: Line 16:
Get both end stations working. Check we have correct number of cables (againi tomorrow).  . attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
Line 14: Line 18:
Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)  . attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
Line 16: Line 20:
Simulated Green Locking.  . attachment:red.png Simulated Green Locking.
Line 18: Line 22:
Either Green locking or simulated plant LSC (or in parallel).  . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
Line 20: Line 24:
Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.  . attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
Line 22: Line 26:
Simulated Green Locking.  . attachment:red.png Simulated Green Locking.
Line 24: Line 28:
Either Green locking or simulated plant LSC (or in parallel).  . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
Line 26: Line 30:
Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).  . attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
Line 28: Line 32:
[[BR]]
[[BR]]
== TIME LINE SCHEDULE ==

[[BR]]
[[BR]]

-----------
= DETAILED CONSIDERATION =
== Cable Requirements ==

Do we have sufficient number of cables ?

[[BR]]
[[BR]]

== Notes about Binary Outputs ==

[[BR]]
[[BR]]

== Reflective Memory Network ==

[[BR]]
[[BR]]

== Simulated Plant for Green locking ==

[[BR]]
[[BR]]

September CDS plan

BR BR

PLANS

TO DO LIST

  • attachment:green.png complete

    attachment:orange.png intermediate state

    attachment:red.png incomplete

    attachment:black.png gave up

  • attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
  • attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
  • attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
  • attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
  • attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).

BR BR

TIME LINE SCHEDULE

BR BR


DETAILED CONSIDERATION

Cable Requirements

Do we have sufficient number of cables ?

BR BR

Notes about Binary Outputs

BR BR

Reflective Memory Network

BR BR

Simulated Plant for Green locking

BR BR

CDS/September_CDS_plan (last edited 2012-01-03 23:02:37 by localhost)