Differences between revisions 3 and 4
Revision 3 as of 2010-09-07 18:37:37
Size: 1012
Editor: KiwamuIzumi
Comment:
Revision 4 as of 2010-09-07 18:39:18
Size: 1242
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Complete suspension damping keeping in mind Version B coils. (1-2 days?)  . attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
Line 10: Line 10:
Get RFM working! (We have new parts and need new IPC parser) (3-4 days)  . attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
Line 12: Line 12:
Get both end stations working. Check we have correct number of cables (againi tomorrow).  . attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
Line 14: Line 14:
Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)  . attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
Line 16: Line 16:
Simulated Green Locking.  . attachment:red.png Simulated Green Locking.
Line 18: Line 18:
Either Green locking or simulated plant LSC (or in parallel).  . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
Line 20: Line 20:
Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.  . attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
Line 22: Line 22:
Simulated Green Locking.  . attachment:red.png Simulated Green Locking.
Line 24: Line 24:
Either Green locking or simulated plant LSC (or in parallel).  . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
Line 26: Line 26:
Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).  . attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).

September CDS plan

TO DO LIST

attachment:green.png complete

attachment:orange.png intermediate state

attachment:red.png incomplete

attachment:black.png gave up

  • attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
  • attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
  • attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
  • attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
  • attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).