Size: 824
Comment:
|
← Revision 71 as of 2012-01-03 23:02:37 ⇥
Size: 6685
Comment: converted to 1.6 markup
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| ## page was renamed from Upgrade 09/CDS/September CDS plan | |
| Line 3: | Line 4: |
| = Action Items = Binary Output working (Alex/Joe) 1-2 days |
== Major Missions == |
| Line 6: | Line 6: |
| Complete suspension damping keeping in mind Version B coils. (1-2 days?) Get RFM working! (We have new parts and need new IPC parser) (3-4 days) |
. {*} Complete damping of the vertex suspensions . {*} Preparation for Green locking . {*} Simulated plants |
| Line 10: | Line 10: |
| Get both end stations working. Check we have correct number of cables (againi tomorrow). | <<BR>> |
| Line 12: | Line 12: |
| Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days) | == Useful Links == || ''''' category'''''|| ''''' description ''''' || ''''' Links '''''|| ||<|3> plans and overviews|| ''' CDS home page ''' || [[Upgrade_09/CDS]] || || ''' CDS plan for August ''' || [[Upgrade_09/CDS/August_CDS_test]] || || ''' Simulated Plant''' ||[[Simulated_Plant]] || ||<|2> Lists || ''' Current Hardware Lists ''' || [[Upgrade_09/CDS/current_hardware]] || || ''' Channel Assignments for C1SUS ''' || [[Upgrade_09/CDS/Suspension_wiring_to_channels]] || ||<|3> Technical Notes || ''' Notes about CDS realtime code ''' || [[Notes_on_getting_the_CDS_Realtime_Code_Generator_working]] || || ''' Notes for Green Locking interface to realtime code ''' || [[Notes_for_Green_locking_interface_to_RCG]] || || ''' Notes for Simulated Plant ''' ||[[Notes_for_the_RCG_40m_simulated_plant]] || <<BR>> ---------------- = PLANS = == TO DO LIST == || {{attachment:green.png}} '''complete'''|| {{attachment:orange.png}} '''intermediate state ''' || {{attachment:red.png}} '''incomplete''' || {{attachment:black.png}} gave up|| <<BR>> . ''' A. Complete suspension damping keeping in mind Version B coils. (1-2 days?) ''' . ''' ADC break out boards ''' . {{attachment:orange.png}} design an adapter box for the breakout boards . {{attachment:red.png}} make the box and install it . ''' Binary Output working on c1sus (Alex/Joe) 1-2 days ''' . {{attachment:orange.png}} rearrange the channel assignments . {{attachment:orange.png}} test all the BO channels and their assignments . {{attachment:green.png}} Switching over cabling from the current XY220's to the new system . ''' damping test with the BOs''' . {{attachment:green.png}} damping all the vertex suspensions with the new CDS . {{attachment:green.png}} check if the binary outputs are working . {{attachment:orange.png}} make the daq daemon work . ''' refinement of the control model ''' . {{attachment:green.png}} renewal of realtime control model . {{attachment:orange.png}} renewal of medm screens for the vertex suspensions . {{attachment:orange.png}} separate optics into some realtime models instead of one model in order to avoid run time issues . ''' misc. ''' . {{attachment:green.png}} fix {{{ feCodeGen.pl }}} script <<BR>> . ''' B. Preparation for Green Locking ''' . ''' Get RFM working (3-4 days) ''' . {{attachment:green.png}} make a new IPC parser . {{attachment:green.png}} string the RFM optical fiber connecting C1SUS and C1ISCEX . {{attachment:green.png}} switching the RFM old network to that of the new one by using the RFM bypath . {{attachment:green.png}} install PCI-5565 driver if it's necessary . {{attachment:orange.png}} test the RFM card by running the diagnostic script . {{attachment:orange.png}} test the RFM with the epics |
| Line 14: | Line 60: |
| Simulated Green Locking. | . ''' Get both end stations working ''' . {{attachment:red.png}} Check we have correct number of cables . {{attachment:green.png}} Check if both end stations are correctly running . ''' Get IOO front end machine working ''' . {{attachment:green.png}} Move the computer into 1X2 rack . {{attachment:green.png}} remove Marconi(?) and put a new IO chassis on 1X2 rack . {{attachment:green.png}} check timing/ADC/DAC on the IO chassis. And make it works (5 days) . ''' Fix non-working IO chassis ''' . {{attachment:green.png}} Check on fiber with Rolf for LSC . {{attachment:green.png}} timing/ADC/DAC check <<BR>> . ''' C. Simulated Plant ''' . ''' Simulated Green Locking ''' . {{attachment:green.png}} conceptual design . {{attachment:green.png}} make realtime simlink model . {{attachment:orange.png}} compile and install the model |
| Line 16: | Line 80: |
| Either Green locking or simulated plant LSC (or in parallel). | . ''' LSC simulated plant ''' . {{attachment:green.png}} conceptual design . {{attachment:green.png}} make realtime simlink model . {{attachment:orange.png}} compile and install the model . ''' SUS simulated plant ''' . {{attachment:red.png}} renew the model with the new CDS parts . {{attachment:red.png}} compile and install the model <<BR>> . '''D. Frame builder ''' . ''' rebuild frame builder''' . {{attachment:green.png}} rebuild the frame builder by Gentoo OS . {{attachment:orange.png}} get dataviewer working . {{attachment:green.png}} install a heavy duty DAQ router . ''' diskless boot ''' . {{attachment:orange.png}} diskless boot seetings on the frame builder . {{attachment:orange.png}} run the front end machines with Gentoo realtime core . {{attachment:green.png}} run a realtime code on a new realtime Gentoo |
| Line 18: | Line 101: |
| Fix non-working IO chassis (today). Check on fiber with Rolf for LSC. | <<BR>> <<BR>> == PSL Racks Setup == {{attachment:1X1_1X2_racks.png}} New rack setup in pdf form [[attachment:1X1_1X2_racks.pdf]] == WISH LIST == (not urgent things, but somethings we want to implement at some points) . ''' channel wiki ''' . ''' wiki hyperlink on a medm screen ''' <<BR>> <<BR>> == TIME LINE SCHEDULE == . Put time line schedule here. <<BR>> <<BR>> ----------- = DETAILED CONSIDERATIONs = == Cable Requirements == . Do we have sufficient number of the cables ? . Let's doublecheck it. . {i} [[Upgrade_09/CDS/current_hardware| Current Hardwares Lists]] <<BR>> <<BR>> == Notes about Binary Outputs == . To obtain a voltage signal, a pull-up resister and a DC voltage are needed at the receiver stage because the signal is generated with a transistor. . An easy way to check this BO system is putting an LED on the receiver stage as described in the figure below. In this case if the signal is ON the LED lights up and vice versa. <<BR>> || ''' normal operation ''' || ''' test configuration ''' || || [[void|{{attachment:BO_final.png||height=260}}]] || [[void|{{attachment:BO_test.png||height=260}}]] || . A datasheet for the BO card is here [[attachment:contec32BO.pdf]] <<BR>> <<BR>> == Reflective Memory Network == . What is the temporary configuration ? . What is the final configuration ? <<BR>> <<BR>> == Simulated Plant for Green locking == === Conceptual Design === |
| Line 20: | Line 167: |
| Simulated Green Locking. | . [[void|{{attachment:green_sm.png||height=340}}]] |
| Line 22: | Line 169: |
| Either Green locking or simulated plant LSC (or in parallel). | |
| Line 24: | Line 170: |
| Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time). |
. [[void|{{attachment:green_simlated_plant.png||height=340}}]] === Model construction === <<BR>> <<BR>> == Gain Mismatch == <<BR>> <<BR>> |
September CDS plan
Major Missions
Complete damping of the vertex suspensions
Preparation for Green locking
Simulated plants
Useful Links
category |
description |
Links |
plans and overviews |
CDS home page |
|
CDS plan for August |
||
Simulated Plant |
||
Lists |
Current Hardware Lists |
|
Channel Assignments for C1SUS |
||
Technical Notes |
Notes about CDS realtime code |
|
Notes for Green Locking interface to realtime code |
||
Notes for Simulated Plant |
PLANS
TO DO LIST
complete
intermediate state
incomplete
gave up
A. Complete suspension damping keeping in mind Version B coils. (1-2 days?)
ADC break out boards
design an adapter box for the breakout boards
make the box and install it
Binary Output working on c1sus (Alex/Joe) 1-2 days
rearrange the channel assignments
test all the BO channels and their assignments
Switching over cabling from the current XY220's to the new system
damping test with the BOs
damping all the vertex suspensions with the new CDS
check if the binary outputs are working
make the daq daemon work
refinement of the control model
renewal of realtime control model
renewal of medm screens for the vertex suspensions
separate optics into some realtime models instead of one model in order to avoid run time issues
misc.
fix feCodeGen.pl script
B. Preparation for Green Locking
Get RFM working (3-4 days)
make a new IPC parser
string the RFM optical fiber connecting C1SUS and C1ISCEX
switching the RFM old network to that of the new one by using the RFM bypath
install PCI-5565 driver if it's necessary
test the RFM card by running the diagnostic script
test the RFM with the epics
Get both end stations working
Check we have correct number of cables
Check if both end stations are correctly running
Get IOO front end machine working
Move the computer into 1X2 rack
remove Marconi(?) and put a new IO chassis on 1X2 rack
check timing/ADC/DAC on the IO chassis. And make it works (5 days)
Fix non-working IO chassis
Check on fiber with Rolf for LSC
timing/ADC/DAC check
C. Simulated Plant
Simulated Green Locking
conceptual design
make realtime simlink model
compile and install the model
LSC simulated plant
conceptual design
make realtime simlink model
compile and install the model
SUS simulated plant
renew the model with the new CDS parts
compile and install the model
D. Frame builder
rebuild frame builder
rebuild the frame builder by Gentoo OS
get dataviewer working
install a heavy duty DAQ router
diskless boot
diskless boot seetings on the frame builder
run the front end machines with Gentoo realtime core
run a realtime code on a new realtime Gentoo
PSL Racks Setup
New rack setup in pdf form 1X1_1X2_racks.pdf
WISH LIST
(not urgent things, but somethings we want to implement at some points)
channel wiki
wiki hyperlink on a medm screen
TIME LINE SCHEDULE
- Put time line schedule here.
DETAILED CONSIDERATIONs
Cable Requirements
- Do we have sufficient number of the cables ?
- Let's doublecheck it.
Notes about Binary Outputs
- To obtain a voltage signal, a pull-up resister and a DC voltage are needed at the receiver stage because the signal is generated with a transistor.
- An easy way to check this BO system is putting an LED on the receiver stage as described in the figure below. In this case if the signal is ON the LED lights up and vice versa.
A datasheet for the BO card is here contec32BO.pdf
Reflective Memory Network
- What is the temporary configuration ?
- What is the final configuration ?
Simulated Plant for Green locking
Conceptual Design
Model construction
Gain Mismatch