= Action Items =
Binary Output working (Alex/Joe) 1-2 days
= PLANS =
== TO DO LIST ==
 || attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up||
Line 6: Line 7:
Complete suspension damping keeping in mind Version B coils. (1-2 days?)  . attachment:orange.png Binary Output working (Alex/Joe) 1-2 days

 . attachment:orange.png
Complete suspension damping keeping in mind Version B coils. (1-2 days?)
Line 8: Line 11:
Get RFM working! (We have new parts and need new IPC parser) (3-4 days)  . attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
Line 10: Line 13:
Get both end stations working. Check we have correct number of cables (againi tomorrow).  . attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
Line 12: Line 15:
Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)  . attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
Line 14: Line 17:
Simulated Green Locking.  . attachment:red.png Simulated Green Locking.
Line 16: Line 19:
Either Green locking or simulated plant LSC (or in parallel).  . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
Line 18: Line 21:
Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.  . attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
Line 20: Line 23:
Simulated Green Locking.  . attachment:red.png Simulated Green Locking.
Line 22: Line 25:
Either Green locking or simulated plant LSC (or in parallel).  . attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
Line 24: Line 27:
Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).  . attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
Line 26: Line 29:

== TIME LINE SCHEDULE ==


-----------
= DETAILED CONSIDERATION =
== Cable Requirements ==

Do we have sufficient number of cables ?

September CDS plan

PLANS

TO DO LIST

  • attachment:green.png complete

    attachment:orange.png intermediate state

    attachment:red.png incomplete

    attachment:black.png gave up

  • attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
  • attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
  • attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
  • attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
  • attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
  • attachment:red.png Simulated Green Locking.
  • attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
  • attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).

TIME LINE SCHEDULE


DETAILED CONSIDERATION

Cable Requirements

Do we have sufficient number of cables ?