| = Action Items = Binary Output working (Alex/Joe) 1-2 days |
= PLANS = == TO DO LIST == || attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up|| |
| Line 6: | Line 7: |
| Complete suspension damping keeping in mind Version B coils. (1-2 days?) | . attachment:orange.png Binary Output working (Alex/Joe) 1-2 days . attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?) |
| Line 8: | Line 11: |
| Get RFM working! (We have new parts and need new IPC parser) (3-4 days) | . attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days) |
| Line 10: | Line 13: |
| Get both end stations working. Check we have correct number of cables (againi tomorrow). | . attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow). |
| Line 12: | Line 15: |
| Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days) | . attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days) |
| Line 14: | Line 17: |
| Simulated Green Locking. | . attachment:red.png Simulated Green Locking. |
| Line 16: | Line 19: |
| Either Green locking or simulated plant LSC (or in parallel). | . attachment:red.png Either Green locking or simulated plant LSC (or in parallel). |
| Line 18: | Line 21: |
| Fix non-working IO chassis (today). Check on fiber with Rolf for LSC. | . attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC. |
| Line 20: | Line 23: |
| Simulated Green Locking. | . attachment:red.png Simulated Green Locking. |
| Line 22: | Line 25: |
| Either Green locking or simulated plant LSC (or in parallel). | . attachment:red.png Either Green locking or simulated plant LSC (or in parallel). |
| Line 24: | Line 27: |
| Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time). | . attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time). |
| Line 26: | Line 29: |
== TIME LINE SCHEDULE == ----------- = DETAILED CONSIDERATION = == Cable Requirements == Do we have sufficient number of cables ? |
September CDS plan
PLANS
TO DO LIST
attachment:green.png complete
attachment:orange.png intermediate state
attachment:red.png incomplete
attachment:black.png gave up
- attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
- attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
- attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
- attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
- attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
TIME LINE SCHEDULE
DETAILED CONSIDERATION
Cable Requirements
Do we have sufficient number of cables ?