| = Action Items = Binary Output working (Alex/Joe) 1-2 days |
== Major Missions == |
| Line 6: | Line 5: |
| Complete suspension damping keeping in mind Version B coils. (1-2 days?) | . {*} Make the Binary Outputs work on C1SUS and damp the vertex suspensions . {*} Make the Reflective Memory Network work . {*} Simulated plant for Green locking [[BR]] [[BR]] = PLANS = == TO DO LIST == || attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''incomplete''' || attachment:black.png gave up|| . attachment:orange.png Binary Output working (Alex/Joe) 1-2 days . attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?) |
| Line 8: | Line 21: |
| Get RFM working! (We have new parts and need new IPC parser) (3-4 days) | . attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days) |
| Line 10: | Line 23: |
| Get both end stations working. Check we have correct number of cables (againi tomorrow). | . attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow). |
| Line 12: | Line 25: |
| Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days) | . attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days) |
| Line 14: | Line 27: |
| Simulated Green Locking. | . attachment:red.png Simulated Green Locking. |
| Line 16: | Line 29: |
| Either Green locking or simulated plant LSC (or in parallel). | . attachment:red.png Either Green locking or simulated plant LSC (or in parallel). |
| Line 18: | Line 31: |
| Fix non-working IO chassis (today). Check on fiber with Rolf for LSC. | . attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC. |
| Line 20: | Line 33: |
| Simulated Green Locking. | . attachment:red.png Simulated Green Locking. |
| Line 22: | Line 35: |
| Either Green locking or simulated plant LSC (or in parallel). | . attachment:red.png Either Green locking or simulated plant LSC (or in parallel). |
| Line 24: | Line 37: |
| Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time). | . attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time). |
| Line 26: | Line 39: |
| [[BR]] [[BR]] == TIME LINE SCHEDULE == . Put time line schedule here. [[BR]] [[BR]] ----------- = DETAILED CONSIDERATIONs = == Cable Requirements == . Do we have sufficient number of the cables ? . Let's doublecheck it. [[BR]] [[BR]] == Notes about Binary Outputs == . How to make a bitwise . relation with the control filter modules [[BR]] [[BR]] == Reflective Memory Network == . What is the temporary configuration ? . What is the final configuration ? [[BR]] [[BR]] == Simulated Plant for Green locking == . Concept . Model construction [[BR]] [[BR]] |
September CDS plan
Major Missions
Make the Binary Outputs work on C1SUS and damp the vertex suspensions
Make the Reflective Memory Network work
Simulated plant for Green locking
PLANS
TO DO LIST
attachment:green.png complete
attachment:orange.png intermediate state
attachment:red.png incomplete
attachment:black.png gave up
- attachment:orange.png Binary Output working (Alex/Joe) 1-2 days
- attachment:orange.png Complete suspension damping keeping in mind Version B coils. (1-2 days?)
- attachment:orange.png Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
- attachment:red.png Get both end stations working. Check we have correct number of cables (againi tomorrow).
- attachment:red.png Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
- attachment:red.png Simulated Green Locking.
- attachment:red.png Either Green locking or simulated plant LSC (or in parallel).
- attachment:red.png Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).
TIME LINE SCHEDULE
- Put time line schedule here.
DETAILED CONSIDERATIONs
Cable Requirements
- Do we have sufficient number of the cables ?
- Let's doublecheck it.
Notes about Binary Outputs
- How to make a bitwise
- relation with the control filter modules
Reflective Memory Network
- What is the temporary configuration ?
- What is the final configuration ?
Simulated Plant for Green locking
- Concept
- Model construction