= Action Items = Binary Output working (Alex/Joe) 1-2 days Complete suspension damping keeping in mind Version B coils. (1-2 days?) Get RFM working! (We have new parts and need new IPC parser) (3-4 days) Get both end stations working. Check we have correct number of cables (againi tomorrow). Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days) Simulated Green Locking. Either Green locking or simulated plant LSC (or in parallel). Fix non-working IO chassis (today). Check on fiber with Rolf for LSC. Simulated Green Locking. Either Green locking or simulated plant LSC (or in parallel). Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time). |
September CDS plan
Action Items
Binary Output working (Alex/Joe) 1-2 days
Complete suspension damping keeping in mind Version B coils. (1-2 days?)
Get RFM working! (We have new parts and need new IPC parser) (3-4 days)
Get both end stations working. Check we have correct number of cables (againi tomorrow).
Get IOO working. (Get thing computer into 1X1 or 1X2 rack, get IO chassis into 1X1 or 1X2 working. (5 days)
Simulated Green Locking.
Either Green locking or simulated plant LSC (or in parallel).
Fix non-working IO chassis (today). Check on fiber with Rolf for LSC.
Simulated Green Locking.
Either Green locking or simulated plant LSC (or in parallel).
Gentoo patch (not high priority - unless they stop making backwards compatibility - do it when we have time).