Size: 6497
Comment:
|
← Revision 28 as of 2012-01-03 23:02:41 ⇥
Size: 6907
Comment: converted to 1.6 markup
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 7: | Line 7: |
| ||attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''nothing happened''' || attachment:black.png gave up|| | ||{{attachment:green.png}} '''complete'''|| {{attachment:orange.png}} '''intermediate state ''' || {{attachment:red.png}} '''nothing happened''' || {{attachment:black.png}} gave up|| |
| Line 9: | Line 9: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 12: | Line 12: |
| || attachment:green.png || measurement of lasers' PZT responses ||[:Advanced_Techniques/Green_Locking/Lasers] || || attachment:green.png || NPRO placement / optical assembly at the end || - || || attachment:green.png || SHG at the end table || - || || attachment:green.png || Control system placement || - || || attachment:green.png || Coarse/fine alignment to the cavity || - || || attachment:green.png || Lock of the green beam to the cavity || - || || attachment:green.png || temperature settings for the doubling crystal || - || || attachment:orange.png || optimization of mode matching || - || || attachment:green.png || noise characterization of the RFPD || - || [[BR]][[BR]] |
|| {{attachment:green.png}} || measurement of lasers' PZT responses ||[[Advanced_Techniques/Green_Locking/Lasers]] || || {{attachment:green.png}} || NPRO placement / optical assembly at the end || - || || {{attachment:green.png}} || SHG at the end table || - || || {{attachment:green.png}} || Control system placement || - || || {{attachment:green.png}} || Coarse/fine alignment to the cavity || - || || {{attachment:green.png}} || Lock of the green beam to the cavity || - || || {{attachment:green.png}} || temperature settings for the doubling crystal || - || || {{attachment:orange.png}} || optimization of mode matching || - || || {{attachment:green.png}} || noise characterization of the RFPD || - || <<BR>><<BR>> |
| Line 25: | Line 25: |
| ||attachment:green.png || lock the laser to the X arm with a dichroic ETM || - || || attachment:green.png ||align X arm to the IR beam, and make it flashing|| - || || attachment:green.png || lock the cavity to the IR (or lock the IR to the cavity)|| - || ||attachment:green.png || A2L to precisely adjust the spot positions for both IR and green.|| - || || attachment:green.png || overlap IR and green path || - || || attachment:green.png || digital control to stabilize X arm || -|| || attachment:orange.png || noise budget || - || |
||{{attachment:green.png}} || lock the laser to the X arm with a dichroic ETM || - || || {{attachment:green.png}} ||align X arm to the IR beam, and make it flashing|| - || || {{attachment:green.png}} || lock the cavity to the IR (or lock the IR to the cavity)|| - || ||{{attachment:green.png}} || A2L to precisely adjust the spot positions for both IR and green.|| - || || {{attachment:green.png}} || overlap IR and green path || - || || {{attachment:green.png}} || digital control to stabilize X arm || -|| || {{attachment:orange.png}} || noise budget || - || |
| Line 33: | Line 33: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 37: | Line 37: |
| || attachment:green.png || set up the optics, laser, doubling crystal and electronics || - || || attachment:green.png || lock the laser to the Y arm with a dichroic ETM || - || |
|| {{attachment:green.png}} || set up the optics, laser, doubling crystal and electronics || - || || {{attachment:green.png}} || lock the laser to the Y arm with a dichroic ETM || - || |
| Line 40: | Line 40: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 43: | Line 43: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 46: | Line 46: |
| || attachment:green.png || mode matching to the crystal || - || || attachment:green.png || SHG at the PSL table || - || || attachment:green.png || rearrangement of the set up due to the PSL upgrade || - || || attachment:green.png || temperature setting for the doubling crystal || - || || attachment:green.png || preparation of the RFPD || - || || attachment:green.png || noise characterization of the RFPD || - || |
|| {{attachment:green.png}} || mode matching to the crystal || - || || {{attachment:green.png}} || SHG at the PSL table || - || || {{attachment:green.png}} || rearrangement of the set up due to the PSL upgrade || - || || {{attachment:green.png}} || temperature setting for the doubling crystal || - || || {{attachment:green.png}} || preparation of the RFPD || - || || {{attachment:green.png}} || noise characterization of the RFPD || - || |
| Line 54: | Line 54: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 58: | Line 58: |
| || attachment:orange.png || conceptual design of simulated plant || - || || attachment:green.png || make a realtime control model || - || || attachment:red.png || make a simulated plant model || - || || attachment:orange.png || GPIB interfaces or RS232 interface to control the crystal temperature || - || || attachment:red.png || measure ADC/DAC noise with the new CDS system || - || || attachment:orange.png || measure time delay of the new CDS systems || - || || attachment:green.png|| get RFM working || - || || attachment:red.png || Think about how we use binary outputs ? || - || || attachment:green.png|| make a slow temperature controller || - || || attachment:orange.png || string cables to ADCs and DACs || done only X end || || attachment:orange.png || medm screens || done only X end || |
|| {{attachment:orange.png}} || conceptual design of simulated plant || - || || {{attachment:green.png}} || make a realtime control model || - || || {{attachment:red.png}} || make a simulated plant model || - || || {{attachment:orange.png}} || GPIB interfaces or RS232 interface to control the crystal temperature || - || || {{attachment:red.png}} || measure ADC/DAC noise with the new CDS system || - || || {{attachment:orange.png}} || measure time delay of the new CDS systems || - || || {{attachment:green.png}}|| get RFM working || - || || {{attachment:red.png}} || Think about how we use binary outputs ? || - || || {{attachment:green.png}}|| make a slow temperature controller || - || || {{attachment:orange.png}} || string cables to ADCs and DACs || done only X end || || {{attachment:orange.png}} || medm screens || done only X end || |
| Line 71: | Line 71: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 74: | Line 74: |
| || attachment:red.png || measure/calculate the requirements for the whitening filter ||/!\ needs to be done soon || || attachment:red.png || build and install the whitening filters || - || || attachment:green.png || modification of the PDH boxes || - || || attachment:green.png || characterization of the PDH box || - || || attachment:green.png || order some electronic racks dedicated for green locking || - || || attachment:green.png || make a summing cricuit with BW of ~200kHz || - || || attachment:green.png || characterization of the VCO box || need a summary || || attachment:red.png || buy one more frequency counter for the other arm || - || || attachment:red.png || make power cables for the corner setup || - || || attachment:red.png || make a dedicated beanote detection circuit board || - || |
|| {{attachment:red.png}} || measure/calculate the requirements for the whitening filter ||/!\ needs to be done soon || || {{attachment:red.png}} || build and install the whitening filters || - || || {{attachment:green.png}} || modification of the PDH boxes || - || || {{attachment:green.png}} || characterization of the PDH box || - || || {{attachment:green.png}} || order some electronic racks dedicated for green locking || - || || {{attachment:green.png}} || make a summing cricuit with BW of ~200kHz || - || || {{attachment:green.png}} || characterization of the VCO box || need a summary || || {{attachment:red.png}} || buy one more frequency counter for the other arm || - || || {{attachment:red.png}} || make power cables for the corner setup || - || || {{attachment:red.png}} || make a dedicated beanote detection circuit board || - || |
| Line 86: | Line 86: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 89: | Line 89: |
| || attachment:green.png || In-vac steering (PO transmission / Periscope / Mirrors)|| - || || attachment:red.png || order new mirrors for SR2 and PR2 || - || || attachment:red.png || installation of new mirrors on SR2 and PR2 || - || |
|| {{attachment:green.png}} || In-vac steering (PO transmission / Periscope / Mirrors)|| - || || {{attachment:red.png}} || order new mirrors for SR2 and PR2 || - || || {{attachment:red.png}} || installation of new mirrors on SR2 and PR2 || - || |
| Line 94: | Line 94: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 98: | Line 98: |
| || attachment:red.png || ADC/DAC noise measurement || -|| || attachment:red.png || evaluations of the PDH end locking || - || || attachment:red.png || Frequency discriminator noise || - || || attachment:red.png || circuit noise || - || || attachment:red.png || estimate the performance from a simulation (or any calculation) || /!\ Needs to be done soon|| || attachment:red.png || f_noise of green beam || - || || attachment:red.png || Relative f_noise between the PSL green and the Arm transmitted green ALS performance || - || |
|| {{attachment:red.png}} || ADC/DAC noise measurement || -|| || {{attachment:red.png}} || evaluations of the PDH end locking || - || || {{attachment:red.png}} || Frequency discriminator noise || - || || {{attachment:red.png}} || circuit noise || - || || {{attachment:red.png}} || estimate the performance from a simulation (or any calculation) || /!\ Needs to be done soon|| || {{attachment:red.png}} || f_noise of green beam || - || || {{attachment:red.png}} || Relative f_noise between the PSL green and the Arm transmitted green ALS performance || - || |
| Line 106: | Line 106: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 109: | Line 109: |
| || attachment:red.png || Automatic handing off scripts || - || || attachment:red.png || Ready-to-go panels for AdvLIGO || - || || attachment:red.png || green coated vacuum chamber's windows || - || || attachment:red.png || dichroic CCD cameras || - || || attachment:red.png || Automatic alignment of the green beam || needs a PZT steering mirrors and WFSs || || attachment:red.png || Green Michelson for precise ETM calibration || optional || || attachment:red.png || Absolute length / mode spacing measurement by green || optional || |
|| {{attachment:red.png}} || Automatic handing off scripts || - || || {{attachment:red.png}} || Ready-to-go panels for AdvLIGO || - || || {{attachment:red.png}} || green coated vacuum chamber's windows || - || || {{attachment:red.png}} || dichroic CCD cameras || - || || {{attachment:red.png}} || Automatic alignment of the green beam || needs a PZT steering mirrors and WFSs || || {{attachment:red.png}} || Green Michelson for precise ETM calibration || optional || || {{attachment:red.png}} || Absolute length / mode spacing measurement by green || optional || |
| Line 117: | Line 117: |
| [[BR]][[BR]] | <<BR>><<BR>> |
| Line 120: | Line 120: |
| || attachment:green.png || recheck order list || - || || attachment:green.png || reorder some of stuff || - || || attachment:orange.png || check the item we have || - || || attachment:green.png || check polarization of the doubling crystal || - || || attachment:orange.png || optimize the damping control of each optic || - || |
|| {{attachment:green.png}} || recheck order list || - || || {{attachment:green.png}} || reorder some of stuff || - || || {{attachment:orange.png}} || check the item we have || - || || {{attachment:green.png}} || check polarization of the doubling crystal || - || || {{attachment:orange.png}} || optimize the damping control of each optic || - || |
Action Item List
<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[0]"] (see also the log)>>
Indicators |
|||
|
|
|
|
X end table arrangement
status |
items |
notes |
|
measurement of lasers' PZT responses |
|
|
NPRO placement / optical assembly at the end |
- |
|
SHG at the end table |
- |
|
Control system placement |
- |
|
Coarse/fine alignment to the cavity |
- |
|
Lock of the green beam to the cavity |
- |
|
temperature settings for the doubling crystal |
- |
|
optimization of mode matching |
- |
|
noise characterization of the RFPD |
- |
X arm locking
status |
items |
notes |
|
lock the laser to the X arm with a dichroic ETM |
- |
|
align X arm to the IR beam, and make it flashing |
- |
|
lock the cavity to the IR (or lock the IR to the cavity) |
- |
|
A2L to precisely adjust the spot positions for both IR and green. |
- |
|
overlap IR and green path |
- |
|
digital control to stabilize X arm |
- |
|
noise budget |
- |
Y end table arrangement
status |
items |
notes |
|
set up the optics, laser, doubling crystal and electronics |
- |
|
lock the laser to the Y arm with a dichroic ETM |
- |
Y arm locking
PSL table arrangement
status |
items |
notes |
|
mode matching to the crystal |
- |
|
SHG at the PSL table |
- |
|
rearrangement of the set up due to the PSL upgrade |
- |
|
temperature setting for the doubling crystal |
- |
|
preparation of the RFPD |
- |
|
noise characterization of the RFPD |
- |
Digital control
status |
items |
notes |
|
conceptual design of simulated plant |
- |
|
make a realtime control model |
- |
|
make a simulated plant model |
- |
|
GPIB interfaces or RS232 interface to control the crystal temperature |
- |
|
measure ADC/DAC noise with the new CDS system |
- |
|
measure time delay of the new CDS systems |
- |
|
get RFM working |
- |
|
Think about how we use binary outputs ? |
- |
|
make a slow temperature controller |
- |
|
string cables to ADCs and DACs |
done only X end |
|
medm screens |
done only X end |
Analog electronics
status |
items |
notes |
|
measure/calculate the requirements for the whitening filter |
/!\ needs to be done soon |
|
build and install the whitening filters |
- |
|
modification of the PDH boxes |
- |
|
characterization of the PDH box |
- |
|
order some electronic racks dedicated for green locking |
- |
|
make a summing cricuit with BW of ~200kHz |
- |
|
characterization of the VCO box |
need a summary |
|
buy one more frequency counter for the other arm |
- |
|
make power cables for the corner setup |
- |
|
make a dedicated beanote detection circuit board |
- |
Vertex tank optical arrangement
status |
items |
notes |
|
In-vac steering (PO transmission / Periscope / Mirrors) |
- |
|
order new mirrors for SR2 and PR2 |
- |
|
installation of new mirrors on SR2 and PR2 |
- |
Performance test
status |
items |
notes |
|
ADC/DAC noise measurement |
- |
|
evaluations of the PDH end locking |
- |
|
Frequency discriminator noise |
- |
|
circuit noise |
- |
|
estimate the performance from a simulation (or any calculation) |
|
|
f_noise of green beam |
- |
|
Relative f_noise between the PSL green and the Arm transmitted green ALS performance |
- |
Sophistication of the scheme
status |
items |
notes |
|
Automatic handing off scripts |
- |
|
Ready-to-go panels for AdvLIGO |
- |
|
green coated vacuum chamber's windows |
- |
|
dichroic CCD cameras |
- |
|
Automatic alignment of the green beam |
needs a PZT steering mirrors and WFSs |
|
Green Michelson for precise ETM calibration |
optional |
|
Absolute length / mode spacing measurement by green |
optional |
misc
status |
items |
notes |
|
recheck order list |
- |
|
reorder some of stuff |
- |
|
check the item we have |
- |
|
check polarization of the doubling crystal |
- |
|
optimize the damping control of each optic |
- |

complete
intermediate state
nothing happened
gave up