Differences between revisions 27 and 28
Revision 27 as of 2011-09-23 06:15:21
Size: 6497
Editor: KiwamuIzumi
Comment:
Revision 28 as of 2012-01-03 23:02:41
Size: 6907
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
[[BR]][[BR]] <<BR>><<BR>>
Line 7: Line 7:
||attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''nothing happened''' || attachment:black.png gave up|| ||{{attachment:green.png}} '''complete'''|| {{attachment:orange.png}} '''intermediate state ''' || {{attachment:red.png}} '''nothing happened''' || {{attachment:black.png}} gave up||
Line 9: Line 9:
[[BR]][[BR]] <<BR>><<BR>>
Line 12: Line 12:
|| attachment:green.png || measurement of lasers' PZT responses ||[:Advanced_Techniques/Green_Locking/Lasers] ||
|| attachment:green.png
|| NPRO placement / optical assembly at the end || - ||
|| attachment:green.png || SHG at the end table || - ||
|| attachment:green.png || Control system placement || - ||
|| attachment:green.png || Coarse/fine alignment to the cavity || - ||
|| attachment:green.png || Lock of the green beam to the cavity || - ||
|| attachment:green.png || temperature settings for the doubling crystal || - ||
|| attachment:orange.png || optimization of mode matching || - ||
|| attachment:green.png || noise characterization of the RFPD || - ||
[[BR]][[BR]]
|| {{attachment:green.png}} || measurement of lasers' PZT responses ||[[Advanced_Techniques/Green_Locking/Lasers]] ||
|| {{attachment:green.png}}
|| NPRO placement / optical assembly at the end || - ||
|| {{attachment:green.png}} || SHG at the end table || - ||
|| {{attachment:green.png}} || Control system placement || - ||
|| {{attachment:green.png}} || Coarse/fine alignment to the cavity || - ||
|| {{attachment:green.png}} || Lock of the green beam to the cavity || - ||
|| {{attachment:green.png}} || temperature settings for the doubling crystal || - ||
|| {{attachment:orange.png}} || optimization of mode matching || - ||
|| {{attachment:green.png}} || noise characterization of the RFPD || - ||
<<BR>><<BR>>
Line 25: Line 25:
||attachment:green.png || lock the laser to the X arm with a dichroic ETM || - ||
|| attachment:green.png ||align X arm to the IR beam, and make it flashing|| - ||
|| attachment:green.png || lock the cavity to the IR (or lock the IR to the cavity)|| - ||
||attachment:green.png || A2L to precisely adjust the spot positions for both IR and green.|| - ||
|| attachment:green.png || overlap IR and green path || - ||
|| attachment:green.png || digital control to stabilize X arm || -||
|| attachment:orange.png || noise budget || - ||
||{{attachment:green.png}} || lock the laser to the X arm with a dichroic ETM || - ||
|| {{attachment:green.png}} ||align X arm to the IR beam, and make it flashing|| - ||
|| {{attachment:green.png}} || lock the cavity to the IR (or lock the IR to the cavity)|| - ||
||{{attachment:green.png}} || A2L to precisely adjust the spot positions for both IR and green.|| - ||
|| {{attachment:green.png}} || overlap IR and green path || - ||
|| {{attachment:green.png}} || digital control to stabilize X arm || -||
|| {{attachment:orange.png}} || noise budget || - ||
Line 33: Line 33:
[[BR]][[BR]] <<BR>><<BR>>
Line 37: Line 37:
|| attachment:green.png || set up the optics, laser, doubling crystal and electronics || - ||
|| attachment:green.png || lock the laser to the Y arm with a dichroic ETM || - ||
|| {{attachment:green.png}} || set up the optics, laser, doubling crystal and electronics || - ||
|| {{attachment:green.png}} || lock the laser to the Y arm with a dichroic ETM || - ||
Line 40: Line 40:
[[BR]][[BR]] <<BR>><<BR>>
Line 43: Line 43:
[[BR]][[BR]] <<BR>><<BR>>
Line 46: Line 46:
|| attachment:green.png || mode matching to the crystal || - ||
|| attachment:green.png || SHG at the PSL table || - ||
|| attachment:green.png || rearrangement of the set up due to the PSL upgrade || - ||
|| attachment:green.png || temperature setting for the doubling crystal || - ||
|| attachment:green.png || preparation of the RFPD || - ||
|| attachment:green.png || noise characterization of the RFPD || - ||
|| {{attachment:green.png}} || mode matching to the crystal || - ||
|| {{attachment:green.png}} || SHG at the PSL table || - ||
|| {{attachment:green.png}} || rearrangement of the set up due to the PSL upgrade || - ||
|| {{attachment:green.png}} || temperature setting for the doubling crystal || - ||
|| {{attachment:green.png}} || preparation of the RFPD || - ||
|| {{attachment:green.png}} || noise characterization of the RFPD || - ||
Line 54: Line 54:
[[BR]][[BR]] <<BR>><<BR>>
Line 58: Line 58:
|| attachment:orange.png || conceptual design of simulated plant || - ||
|| attachment:green.png || make a realtime control model || - ||
|| attachment:red.png || make a simulated plant model || - ||
|| attachment:orange.png || GPIB interfaces or RS232 interface to control the crystal temperature || - ||
|| attachment:red.png || measure ADC/DAC noise with the new CDS system || - ||
|| attachment:orange.png || measure time delay of the new CDS systems || - ||
|| attachment:green.png|| get RFM working || - ||
|| attachment:red.png || Think about how we use binary outputs ? || - ||
|| attachment:green.png|| make a slow temperature controller || - ||
|| attachment:orange.png || string cables to ADCs and DACs || done only X end ||
|| attachment:orange.png || medm screens || done only X end ||
|| {{attachment:orange.png}} || conceptual design of simulated plant || - ||
|| {{attachment:green.png}} || make a realtime control model || - ||
|| {{attachment:red.png}} || make a simulated plant model || - ||
|| {{attachment:orange.png}} || GPIB interfaces or RS232 interface to control the crystal temperature || - ||
|| {{attachment:red.png}} || measure ADC/DAC noise with the new CDS system || - ||
|| {{attachment:orange.png}} || measure time delay of the new CDS systems || - ||
|| {{attachment:green.png}}|| get RFM working || - ||
|| {{attachment:red.png}} || Think about how we use binary outputs ? || - ||
|| {{attachment:green.png}}|| make a slow temperature controller || - ||
|| {{attachment:orange.png}} || string cables to ADCs and DACs || done only X end ||
|| {{attachment:orange.png}} || medm screens || done only X end ||
Line 71: Line 71:
[[BR]][[BR]] <<BR>><<BR>>
Line 74: Line 74:
|| attachment:red.png || measure/calculate the requirements for the whitening filter ||/!\ needs to be done soon ||
|| attachment:red.png || build and install the whitening filters || - ||
|| attachment:green.png || modification of the PDH boxes || - ||
|| attachment:green.png || characterization of the PDH box || - ||
|| attachment:green.png || order some electronic racks dedicated for green locking || - ||
|| attachment:green.png || make a summing cricuit with BW of ~200kHz || - ||
|| attachment:green.png || characterization of the VCO box || need a summary ||
|| attachment:red.png || buy one more frequency counter for the other arm || - ||
|| attachment:red.png || make power cables for the corner setup || - ||
|| attachment:red.png || make a dedicated beanote detection circuit board || - ||
|| {{attachment:red.png}} || measure/calculate the requirements for the whitening filter ||/!\ needs to be done soon ||
|| {{attachment:red.png}} || build and install the whitening filters || - ||
|| {{attachment:green.png}} || modification of the PDH boxes || - ||
|| {{attachment:green.png}} || characterization of the PDH box || - ||
|| {{attachment:green.png}} || order some electronic racks dedicated for green locking || - ||
|| {{attachment:green.png}} || make a summing cricuit with BW of ~200kHz || - ||
|| {{attachment:green.png}} || characterization of the VCO box || need a summary ||
|| {{attachment:red.png}} || buy one more frequency counter for the other arm || - ||
|| {{attachment:red.png}} || make power cables for the corner setup || - ||
|| {{attachment:red.png}} || make a dedicated beanote detection circuit board || - ||
Line 86: Line 86:
[[BR]][[BR]] <<BR>><<BR>>
Line 89: Line 89:
|| attachment:green.png || In-vac steering (PO transmission / Periscope / Mirrors)|| - ||
|| attachment:red.png || order new mirrors for SR2 and PR2 || - ||
|| attachment:red.png || installation of new mirrors on SR2 and PR2 || - ||
|| {{attachment:green.png}} || In-vac steering (PO transmission / Periscope / Mirrors)|| - ||
|| {{attachment:red.png}} || order new mirrors for SR2 and PR2 || - ||
|| {{attachment:red.png}} || installation of new mirrors on SR2 and PR2 || - ||
Line 94: Line 94:
[[BR]][[BR]] <<BR>><<BR>>
Line 98: Line 98:
|| attachment:red.png || ADC/DAC noise measurement || -||
|| attachment:red.png || evaluations of the PDH end locking || - ||
|| attachment:red.png || Frequency discriminator noise || - ||
|| attachment:red.png || circuit noise || - ||
|| attachment:red.png || estimate the performance from a simulation (or any calculation) || /!\ Needs to be done soon||
|| attachment:red.png || f_noise of green beam || - ||
|| attachment:red.png || Relative f_noise between the PSL green and the Arm transmitted green ALS performance || - ||
|| {{attachment:red.png}} || ADC/DAC noise measurement || -||
|| {{attachment:red.png}} || evaluations of the PDH end locking || - ||
|| {{attachment:red.png}} || Frequency discriminator noise || - ||
|| {{attachment:red.png}} || circuit noise || - ||
|| {{attachment:red.png}} || estimate the performance from a simulation (or any calculation) || /!\ Needs to be done soon||
|| {{attachment:red.png}} || f_noise of green beam || - ||
|| {{attachment:red.png}} || Relative f_noise between the PSL green and the Arm transmitted green ALS performance || - ||
Line 106: Line 106:
[[BR]][[BR]] <<BR>><<BR>>
Line 109: Line 109:
|| attachment:red.png || Automatic handing off scripts || - ||
|| attachment:red.png || Ready-to-go panels for AdvLIGO || - ||
|| attachment:red.png || green coated vacuum chamber's windows || - ||
|| attachment:red.png || dichroic CCD cameras || - ||
|| attachment:red.png || Automatic alignment of the green beam || needs a PZT steering mirrors and WFSs ||
|| attachment:red.png || Green Michelson for precise ETM calibration || optional ||
|| attachment:red.png || Absolute length / mode spacing measurement by green || optional ||
|| {{attachment:red.png}} || Automatic handing off scripts || - ||
|| {{attachment:red.png}} || Ready-to-go panels for AdvLIGO || - ||
|| {{attachment:red.png}} || green coated vacuum chamber's windows || - ||
|| {{attachment:red.png}} || dichroic CCD cameras || - ||
|| {{attachment:red.png}} || Automatic alignment of the green beam || needs a PZT steering mirrors and WFSs ||
|| {{attachment:red.png}} || Green Michelson for precise ETM calibration || optional ||
|| {{attachment:red.png}} || Absolute length / mode spacing measurement by green || optional ||
Line 117: Line 117:
[[BR]][[BR]] <<BR>><<BR>>
Line 120: Line 120:
|| attachment:green.png || recheck order list || - ||
|| attachment:green.png || reorder some of stuff || - ||
|| attachment:orange.png || check the item we have || - ||
|| attachment:green.png || check polarization of the doubling crystal || - ||
|| attachment:orange.png || optimize the damping control of each optic || - ||
|| {{attachment:green.png}} || recheck order list || - ||
|| {{attachment:green.png}} || reorder some of stuff || - ||
|| {{attachment:orange.png}} || check the item we have || - ||
|| {{attachment:green.png}} || check polarization of the doubling crystal || - ||
|| {{attachment:orange.png}} || optimize the damping control of each optic || - ||

Action Item List

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[0]"] (see also the log)>>



Indicators

green.png complete

orange.png intermediate state

red.png nothing happened

black.png gave up



X end table arrangement

status

items

notes

green.png

measurement of lasers' PZT responses

Advanced_Techniques/Green_Locking/Lasers

green.png

NPRO placement / optical assembly at the end

-

green.png

SHG at the end table

-

green.png

Control system placement

-

green.png

Coarse/fine alignment to the cavity

-

green.png

Lock of the green beam to the cavity

-

green.png

temperature settings for the doubling crystal

-

orange.png

optimization of mode matching

-

green.png

noise characterization of the RFPD

-



X arm locking

status

items

notes

green.png

lock the laser to the X arm with a dichroic ETM

-

green.png

align X arm to the IR beam, and make it flashing

-

green.png

lock the cavity to the IR (or lock the IR to the cavity)

-

green.png

A2L to precisely adjust the spot positions for both IR and green.

-

green.png

overlap IR and green path

-

green.png

digital control to stabilize X arm

-

orange.png

noise budget

-



Y end table arrangement

status

items

notes

green.png

set up the optics, laser, doubling crystal and electronics

-

green.png

lock the laser to the Y arm with a dichroic ETM

-



Y arm locking



PSL table arrangement

status

items

notes

green.png

mode matching to the crystal

-

green.png

SHG at the PSL table

-

green.png

rearrangement of the set up due to the PSL upgrade

-

green.png

temperature setting for the doubling crystal

-

green.png

preparation of the RFPD

-

green.png

noise characterization of the RFPD

-



Digital control

status

items

notes

orange.png

conceptual design of simulated plant

-

green.png

make a realtime control model

-

red.png

make a simulated plant model

-

orange.png

GPIB interfaces or RS232 interface to control the crystal temperature

-

red.png

measure ADC/DAC noise with the new CDS system

-

orange.png

measure time delay of the new CDS systems

-

green.png

get RFM working

-

red.png

Think about how we use binary outputs ?

-

green.png

make a slow temperature controller

-

orange.png

string cables to ADCs and DACs

done only X end

orange.png

medm screens

done only X end



Analog electronics

status

items

notes

red.png

measure/calculate the requirements for the whitening filter

/!\ needs to be done soon

red.png

build and install the whitening filters

-

green.png

modification of the PDH boxes

-

green.png

characterization of the PDH box

-

green.png

order some electronic racks dedicated for green locking

-

green.png

make a summing cricuit with BW of ~200kHz

-

green.png

characterization of the VCO box

need a summary

red.png

buy one more frequency counter for the other arm

-

red.png

make power cables for the corner setup

-

red.png

make a dedicated beanote detection circuit board

-



Vertex tank optical arrangement

status

items

notes

green.png

In-vac steering (PO transmission / Periscope / Mirrors)

-

red.png

order new mirrors for SR2 and PR2

-

red.png

installation of new mirrors on SR2 and PR2

-



Performance test

status

items

notes

red.png

ADC/DAC noise measurement

-

red.png

evaluations of the PDH end locking

-

red.png

Frequency discriminator noise

-

red.png

circuit noise

-

red.png

estimate the performance from a simulation (or any calculation)

/!\ Needs to be done soon

red.png

f_noise of green beam

-

red.png

Relative f_noise between the PSL green and the Arm transmitted green ALS performance

-



Sophistication of the scheme

status

items

notes

red.png

Automatic handing off scripts

-

red.png

Ready-to-go panels for AdvLIGO

-

red.png

green coated vacuum chamber's windows

-

red.png

dichroic CCD cameras

-

red.png

Automatic alignment of the green beam

needs a PZT steering mirrors and WFSs

red.png

Green Michelson for precise ETM calibration

optional

red.png

Absolute length / mode spacing measurement by green

optional



misc

status

items

notes

green.png

recheck order list

-

green.png

reorder some of stuff

-

orange.png

check the item we have

-

green.png

check polarization of the doubling crystal

-

orange.png

optimize the damping control of each optic

-