Differences between revisions 7 and 9 (spanning 2 versions)
Revision 7 as of 2011-01-06 20:39:18
Size: 2494
Editor: KiwamuIzumi
Comment:
Revision 9 as of 2011-01-06 20:49:05
Size: 2640
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
[[BR]]
Line 16: Line 17:
|| setup DC_PD at an available port || to find a fringe ||<:>attachment:green.png || put Thorlabs PDA255 at AS || || setup DC_PD at an available port || to find a fringe ||<:>attachment:green.png || attachment:help.png put Thorlabs PDA255 at AS  ||
Line 19: Line 20:
|| make a simple mod/demod system || to lock the IR ||<:>attachment:red.png || || || hook it up TRANS_MON to ADC|| {{{ c1iscex }}}||<:>attachment:red.png || ||
|| make a simple mod/demod system || to lock the IR without {{{c1lsc }}}||<:>attachment:red.png || ||
Line 25: Line 27:
|| change beam axis || ||<:>attachment:red.png || need a helper || || change beam axis || ||<:>attachment:red.png || attachment:help.png ||
Line 34: Line 36:
|| temperature tuning of the lasers || ||<:>attachment:red.png || need a helper || || temperature tuning of the lasers || ||<:>attachment:red.png || attachment:help.png ||
Line 38: Line 40:
||connect VCO signal to ADC || hook up it to {{{ c1ioo }}} ||<:>attachment:red.png|| need a helper || ||connect VCO signal to ADC || hook up it to {{{ c1ioo }}} ||<:>attachment:red.png|| attachment:help.png ||

Plan for January

GOAL of this month

  • to stabilize the arm displacement using the green beat note

BR

Action Items

Indicators

attachment:green.png complete

attachment:orange.png intermediate state

attachment:red.png nothing happened

attachment:black.png gave up

BR BR

Step 1. X arm alignment for IR

action

description

status

notes

setup DC_PD at an available port

to find a fringe

attachment:green.png

attachment:help.png put Thorlabs PDA255 at AS

align BS, ITMX and ETMX

attachment:green.png

place TRANS_MON_PD

attachment:red.png

hook it up TRANS_MON to ADC

 c1iscex 

attachment:red.png

make a simple mod/demod system

to lock the IR without c1lsc 

attachment:red.png

feeding back the signal to MCL

to lock the IR

attachment:red.png

A2L for IR

for precise alignment

attachment:red.png

Step 2. Re-alignment of green

action

description

status

notes

change beam axis

attachment:red.png

attachment:help.png

rearrange the optical setup at X end

if necessary

attachment:red.png

lock the green to X arm

attachment:red.png

overlap the axis to the IR

using A2L

attachment:red.png

Step 3. Beat note detection

action

description

status

notes

finalize the setup at PSL table

Electronics, cables and etc.,..

attachment:red.png

alignment of optics at PSL table

attachment:red.png

temperature tuning of the lasers

attachment:red.png

attachment:help.png

Step 4. Digital control to stabilize X arm

action

description

status

notes

connect VCO signal to ADC

hook up it to  c1ioo 

attachment:red.png

attachment:help.png

simulink model refinement

attachment:red.png

DAQ setting

attachment:red.png

feedback to ETMX

attachment:red.png

medm screen

attachment:red.png

Advanced_Techniques/Green_Locking/January_2011 (last edited 2012-01-03 23:02:44 by localhost)