Line 39: Line 39:
|| 3-E || phase lock the VCO || if the MC is too loud, MCL feedback is needed ||<:>attachment:green.png || || || 3-E || phase lock the VCO || ||<:>attachment:green.png || ||

GOALs of this month

  • 1. to stabilize the PSL by taking the green beat note signal and actuating the MC length while assuming the X arm is a stable reference

  • 2. to measure the stability of the beat note and to compare it with that of the IR PDH signal

  • => above two actions finally answer the question : the green locking is stable enough to hand off the control servo to IR or not ?

BR

Action Items

Indicators

attachment:green.png complete

attachment:orange.png intermediate state

attachment:red.png nothing happened

attachment:black.png gave up

BR BR

Step 1. X arm alignment for IR

action

description

status

notes

1-A

setup DC_PD at an available port

to find a fringe

attachment:green.png

attachment:help.png put Thorlabs PDA255 at AS

1-B

align BS, ITMX and ETMX

to have TEM00 flash

attachment:green.png

put a camera at ETMX_TRANS

1-C

place TRANS_MON_PD and QPD

attachment:orange.png

1-D

hook it up TRANS_MON and QPD to ADC

 c1iscex 

attachment:green.png

1-E

make a simple mod/demod system

to lock the IR

attachment:green.png

attachment:help.png

1-F

feeding back the signal to MCL

to lock the IR

attachment:green.png

attachment:help.png

1-G

add a LOCKIN module into c1sus and c1iscex

for A2L

attachment:red.png

1-H

A2L for IR

for precise alignment

attachment:red.png

touch PZT1 and PZT2 ?

Step 2. Re-alignment of green

action

description

status

notes

2-A

change beam axis

steer the mirrors at X end

attachment:green.png

attachment:help.png

2-B

rearrange the optical setup at X end

if necessary

attachment:green.png

2-C

lock the green to X arm

attachment:green.png

2-D

more precisely overlap the green beam axis to the IR

using A2L

attachment:red.png

Step 3. Beat note detection

action

description

status

notes

3-A

finalize the setup at PSL table

Electronics, cables and etc.,..

attachment:orange.png

3-B

alignment of optics at PSL table

attachment:green.png

3-C

temperature tuning of the lasers

attachment:green.png

attachment:help.png

3-D

check frequency counter

attachment:green.png

attachment:help.png

3-E

phase lock the VCO

attachment:green.png

Step 4. Digital control to stabilize the PSL

action

description

status

notes

4-A

connect VCO signal to ADC

 c1ioo  or  c1lsc 

attachment:red.png

attachment:help.png

4-B

connect some monitor signals to ADC

green refl, trans, ..etc.,

attachment:red.png

4-B

simulink model refinement

attachment:red.png

4-C

DAQ setting

attachment:red.png

4-D

feedback to MC2 length

attachment:red.png

4-E

medm screen

attachment:red.png

Step 5. measurement

action

description

status

notes

5-A

cavity scan

adding offsets onto MC2 feedback

attachment:red.png

5-B

measure the stability of beat note and IR PDH

attachment:red.png

5-C

perform the same measurement while X arm is locked to IR

attachment:red.png

optional (?)