Differences between revisions 2 and 6 (spanning 4 versions)
Revision 2 as of 2011-01-06 20:00:49
Size: 112
Editor: KiwamuIzumi
Comment:
Revision 6 as of 2011-01-06 20:35:32
Size: 2182
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 . to stabilize the arm displacement using the green beat note  . ''' to stabilize the arm displacement using the green beat note '''

[[BR]]


= Action Items =

||||||||<tablestyle="width: 80%">'''''Indicators'''''||
||attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''nothing happened''' || attachment:black.png gave up||

[[BR]]
||||||||<tablestyle="width: 80%">'''''Step 1. X arm alignment for IR '''''||
||<:>''''' action ''''' ||<:>''''' description ''''' ||<:> ''''' status ''''' ||<:> ''''' notes '''''||
|| setup DC_PD at an available port || to find a fringe ||<:>attachment:green.png || put Thorlabs PDA255 at AS ||
|| align BS, ITMX and ETMX || ||<:>attachment:green.png || ||
|| place TRANS_MON_PD || ||<:>attachment:red.png || ||
|| make a simple mod/demod system || to lock the IR ||<:>attachment:red.png || ||
|| feeding back the signal to MCL || to lock the IR ||<:>attachment:red.png || ||
|| A2L for IR || for precise alignment ||<:>attachment:red.png || ||
||||||||||
||||||||<tablestyle="width: 80%">'''''Step 2. Re-alignment of green '''''||
||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:> ''''' notes '''''||
|| change beam axis || ||<:>attachment:red.png || need a helper ||
|| rearrange the optical setup at X end || if necessary ||<:>attachment:red.png || ||
|| lock the green to X arm || ||<:>attachment:red.png || ||
|| overlap the axis to the IR || using A2L ||<:>attachment:red.png || ||
||||||||||
||||||||<tablestyle="width: 80%">'''''Step 3. Beat note detection '''''||
||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:> ''''' notes '''''||
|| finalize the setup at PSL table || Electronics, cables and etc.,.. ||<:>attachment:red.png || ||
|| alignment of optics at PSL table || ||<:>attachment:red.png || ||
|| temperature tuning of the lasers || ||<:>attachment:red.png || need a helper ||
||||||||||
||||||||<tablestyle="width: 80%">'''''Step 4. Digital control to stabilize X arm '''''||
||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:>''''' notes '''''||

Plan for January

GOAL of this month

  • to stabilize the arm displacement using the green beat note

BR

Action Items

Indicators

attachment:green.png complete

attachment:orange.png intermediate state

attachment:red.png nothing happened

attachment:black.png gave up

BR

Step 1. X arm alignment for IR

action

description

status

notes

setup DC_PD at an available port

to find a fringe

attachment:green.png

put Thorlabs PDA255 at AS

align BS, ITMX and ETMX

attachment:green.png

place TRANS_MON_PD

attachment:red.png

make a simple mod/demod system

to lock the IR

attachment:red.png

feeding back the signal to MCL

to lock the IR

attachment:red.png

A2L for IR

for precise alignment

attachment:red.png

Step 2. Re-alignment of green

action

description

status

notes

change beam axis

attachment:red.png

need a helper

rearrange the optical setup at X end

if necessary

attachment:red.png

lock the green to X arm

attachment:red.png

overlap the axis to the IR

using A2L

attachment:red.png

Step 3. Beat note detection

action

description

status

notes

finalize the setup at PSL table

Electronics, cables and etc.,..

attachment:red.png

alignment of optics at PSL table

attachment:red.png

temperature tuning of the lasers

attachment:red.png

need a helper

Step 4. Digital control to stabilize X arm

action

description

status

notes

Advanced_Techniques/Green_Locking/January_2011 (last edited 2012-01-03 23:02:44 by localhost)