| = Plan for January = == GOAL of this month == . to stabilize the arm displacement using the green beat note |
## page was renamed from Upgrade 09/GreenLock/January 2011 = GOALs of this month = . '''1. to stabilize the PSL by taking the green beat note signal and actuating the MC length while assuming the X arm is a stable reference ''' . '''2. to measure the stability of the beat note and to compare it with that of the IR PDH signal ''' . ''' => above two actions finally answer the question : the green locking is stable enough to hand off the control servo to IR or not ?''' [[BR]] = Action Items = ||||||||<tablestyle="width: 80%">'''''Indicators'''''|| ||attachment:green.png '''complete'''|| attachment:orange.png '''intermediate state ''' || attachment:red.png '''nothing happened''' || attachment:black.png gave up|| [[BR]] [[BR]] ||||||||||<tablestyle="width: 80%">'''''Step 1. X arm alignment for IR '''''|| || ||<:>''''' action ''''' ||<:>''''' description ''''' ||<:> ''''' status ''''' ||<:> ''''' notes '''''|| || 1-A ||setup DC_PD at an available port || to find a fringe ||<:>attachment:green.png || attachment:help.png put Thorlabs PDA255 at AS || || 1-B || align BS, ITMX and ETMX ||to have TEM00 flash ||<:>attachment:green.png || put a camera at ETMX_TRANS || || 1-C || place TRANS_MON_PD and QPD|| ||<:>attachment:orange.png || || || 1-D || hook it up TRANS_MON and QPD to ADC|| {{{ c1iscex }}}||<:>attachment:green.png || || || 1-E ||make a simple mod/demod system || to lock the IR ||<:>attachment:green.png ||attachment:help.png || || 1-F || feeding back the signal to MCL || to lock the IR ||<:>attachment:green.png || attachment:help.png || || 1-G || add a ''LOCKIN'' module into {{{c1sus}}} and {{{c1iscex}}}|| for A2L ||<:>attachment:orange.png || || || 1-H || A2L for IR || for precise alignment ||<:>attachment:green.png || C1ASS does|| [[BR]][[BR]] ||||||||||<tablestyle="width: 80%">'''''Step 2. Re-alignment of green '''''|| || ||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:> ''''' notes '''''|| || 2-A ||change beam axis ||steer the mirrors at X end ||<:>attachment:green.png || attachment:help.png || || 2-B || rearrange the optical setup at X end || if necessary ||<:>attachment:green.png || || || 2-C || lock the green to X arm || ||<:>attachment:green.png || || || 2-D || more precisely overlap the green beam axis to the IR || using A2L ||<:>attachment:green.png || || [[BR]][[BR]] ||||||||||<tablestyle="width: 80%">'''''Step 3. Beat note detection '''''|| || ||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:> ''''' notes '''''|| || 3-A ||finalize the setup at PSL table || Electronics, cables and etc.,.. ||<:>attachment:orange.png || we need some dedicated power cables || || 3-B ||alignment of optics at PSL table || ||<:>attachment:green.png || || || 3-C ||temperature tuning of the lasers || ||<:>attachment:green.png || attachment:help.png || || 3-D || check frequency counter || ||<:>attachment:orange.png || attachment:help.png frequency resolution not sufficient (~ 7.5kHz) || || 3-E || phase lock the VCO || ||<:>attachment:green.png || || [[BR]][[BR]] ||||||||||<tablestyle="width: 80%">'''''Step 4. Digital control to stabilize the PSL '''''|| || ||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:>''''' notes '''''|| || 4-A ||connect VCO signal to ADC || {{{ c1ioo }}} or {{{ c1lsc }}} ||<:>attachment:green.png|| attachment:help.png || || 4-B || connect some monitor signals to ADC || green refl, trans, ..etc., ||<:>attachment:red.png || || || 4-B ||simulink model refinement || ||<:>attachment:green.png|| || || 4-C || DAQ setting || ||<:>attachment:green.png || || || 4-D || add RFM for feedingback to MC2 || ||<:>attachment:red.png|| || || 4-E || medm screen || ||<:>attachment:orange.png|| || [[BR]] [[BR]] ||||||||||<tablestyle="width: 80%">'''''Step 5. measurement '''''|| || ||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:>''''' notes '''''|| || 5-A || cavity scan || adding offsets onto MC2 feedback ||<:>attachment:green.png|| || || 5-B || measure the stability of beat note and IR PDH || ||<:>attachment:green.png|| || || 5-C || perform the same measurement while X arm is locked to IR || ||<:>attachment:prange.png || what is the dominant noise source || ||||||||||<tablestyle="width: 80%">'''''Step 5. measurement '''''|| || ||<:>''''' action ''''' ||<:>''''' description ''''' ||<:>''''' status ''''' ||<:>''''' notes '''''|| || 5-A || cavity scan || adding offsets onto MC2 feedback ||<:>attachment:green.png|| || || 5-B || measure the stability of beat note and IR PDH || ||<:>attachment:green.png|| || || 5-C || perform the same measurement while X arm is locked to IR || ||<:>attachment:prange.png || what is the dominant noise source || |
GOALs of this month
1. to stabilize the PSL by taking the green beat note signal and actuating the MC length while assuming the X arm is a stable reference
2. to measure the stability of the beat note and to compare it with that of the IR PDH signal
=> above two actions finally answer the question : the green locking is stable enough to hand off the control servo to IR or not ?
Action Items
Indicators |
|||
attachment:green.png complete |
attachment:orange.png intermediate state |
attachment:red.png nothing happened |
attachment:black.png gave up |
Step 1. X arm alignment for IR |
||||
|
action |
description |
status |
notes |
1-A |
setup DC_PD at an available port |
to find a fringe |
attachment:green.png |
attachment:help.png put Thorlabs PDA255 at AS |
1-B |
align BS, ITMX and ETMX |
to have TEM00 flash |
attachment:green.png |
put a camera at ETMX_TRANS |
1-C |
place TRANS_MON_PD and QPD |
|
attachment:orange.png |
|
1-D |
hook it up TRANS_MON and QPD to ADC |
c1iscex |
attachment:green.png |
|
1-E |
make a simple mod/demod system |
to lock the IR |
attachment:green.png |
attachment:help.png |
1-F |
feeding back the signal to MCL |
to lock the IR |
attachment:green.png |
attachment:help.png |
1-G |
add a LOCKIN module into c1sus and c1iscex |
for A2L |
attachment:orange.png |
|
1-H |
A2L for IR |
for precise alignment |
attachment:green.png |
C1ASS does |
Step 2. Re-alignment of green |
||||
|
action |
description |
status |
notes |
2-A |
change beam axis |
steer the mirrors at X end |
attachment:green.png |
attachment:help.png |
2-B |
rearrange the optical setup at X end |
if necessary |
attachment:green.png |
|
2-C |
lock the green to X arm |
|
attachment:green.png |
|
2-D |
more precisely overlap the green beam axis to the IR |
using A2L |
attachment:green.png |
|
Step 3. Beat note detection |
||||
|
action |
description |
status |
notes |
3-A |
finalize the setup at PSL table |
Electronics, cables and etc.,.. |
attachment:orange.png |
we need some dedicated power cables |
3-B |
alignment of optics at PSL table |
|
attachment:green.png |
|
3-C |
temperature tuning of the lasers |
|
attachment:green.png |
attachment:help.png |
3-D |
check frequency counter |
|
attachment:orange.png |
attachment:help.png frequency resolution not sufficient (~ 7.5kHz) |
3-E |
phase lock the VCO |
|
attachment:green.png |
|
Step 4. Digital control to stabilize the PSL |
||||
|
action |
description |
status |
notes |
4-A |
connect VCO signal to ADC |
c1ioo or c1lsc |
attachment:green.png |
attachment:help.png |
4-B |
connect some monitor signals to ADC |
green refl, trans, ..etc., |
attachment:red.png |
|
4-B |
simulink model refinement |
|
attachment:green.png |
|
4-C |
DAQ setting |
|
attachment:green.png |
|
4-D |
add RFM for feedingback to MC2 |
|
attachment:red.png |
|
4-E |
medm screen |
|
attachment:orange.png |
|
Step 5. measurement |
||||
|
action |
description |
status |
notes |
5-A |
cavity scan |
adding offsets onto MC2 feedback |
attachment:green.png |
|
5-B |
measure the stability of beat note and IR PDH |
|
attachment:green.png |
|
5-C |
perform the same measurement while X arm is locked to IR |
|
attachment:prange.png |
what is the dominant noise source |
Step 5. measurement |
||||
|
action |
description |
status |
notes |
5-A |
cavity scan |
adding offsets onto MC2 feedback |
attachment:green.png |
|
5-B |
measure the stability of beat note and IR PDH |
|
attachment:green.png |
|
5-C |
perform the same measurement while X arm is locked to IR |
|
attachment:prange.png |
what is the dominant noise source |