AAAS |
Amercian Association for the Advancement of Science |
ACIGA |
Australian Consortium for Interferometric Gravitational Astronomy |
ACWP |
Actual Cost of Work Performed |
ADC |
Analog-to-Digital Converter |
AdL |
Advanced LIGO |
AMU |
Atomic Mass Unit |
ANU |
Australian National University |
AOC |
Adaptive Optics Compensation |
AOS |
Auxiliary Optics System |
API |
Application Programming Interface |
ASC |
Alignment Sensing and Control |
ATM |
Asynchronous Transfer Mode (communications protocol) |
BAC |
Budget at Completion |
BCWP |
Budgeted Cost of Work Performed |
BCWS |
Budgeted Cost of Work Scheduled |
BH |
Black Hole |
BSC |
Beam Splitter Chamber also Basic Symmetric Chamber |
CACR |
Center for Advanced Computer Research (Caltech) |
CAD |
Computer Aided Design |
CB&I |
Chicago Bridge & Iron |
CCB |
Change Control Board |
CCD |
Charged Coupled Device |
CDR |
Conceptual Design Review |
CDRL |
Contract Data Requirements List |
CDS |
Control and Data Systems |
COC |
Core Optics Components |
CSIRO |
Commonwealth Scientific and Industrial Research Organization (Australia) |
CSSR |
Cost Schedule Status Report |
CW |
Continuous Wave |
DAC |
Digital-to-Analog Converter |
DAQ |
Data Acquisition System |
DCC |
Document Control Center |
DFG |
Dynamic gravity Field Generator |
DMRO |
Differential Mode Read-Out |
DRR |
Design Requirements Review |
DSP |
Digital Signal Processing |
E2E |
End-To-End Modeling (interferometer simulation) |
EAC |
Estimate at Completion |
EPI |
External Pre-Isolator |
EPICS |
Experimental Physics and Industrial Control System |
ER |
Engineering Run |
ETF |
Engineering Test Facility |
ETM |
End Test Mass |
Ex |
Engineering Run x (e.g. E4 is Engineering Run 4) |
FAC |
Facility Modifications |
FDR |
Final Design Review |
FFT |
Fast (Discrete) Fourier Transform |
FTE |
Full Time Equivalent |
GASF |
Geometrical Anti-Spring Filter |
GEO |
British-German Cooperation for Gravity Wave Experiment |
GFLOPS |
1000 MFLOPS |
GG |
Gravity Gradients |
GPS |
Global Positioning System |
GRB |
Gamma-Ray Burst |
GUI |
Graphical User Interface |
GWDAW |
Gravitational Wave Data Analysis Workshop |
GWIC |
Gravitational Wave International Committee |
HAM |
Horizontal Access Modules |
HEPI |
Hydraulic External Pre-Isolator |
HPSS |
High Performance Storage System (IBM) |
HVAC |
Heating, Ventilation and Air Conditioning |
IDE |
Integrated Drive Electronics (disk standard) |
IFO |
Interferometer |
InGaAs |
Indium-Gallium-Arsenide |
INSA |
French National Institute for Applied Science |
IO |
Input Optics |
IP |
Inverted Pendulum |
ISC |
Interferometer Sensing and Control |
ITM |
Input Test Mass |
IV&V |
Integration, Verification, and Validation |
kpc |
Kiloparsec |
LAL |
LIGO Algorithm Library |
LASTI |
LIGO Advanced System Test Interferometer |
LDAS |
LIGO Data Analysis System |
LHO |
LIGO Hanford Observatory |
LIGO |
Laser Interferometer Gravitational-Wave Observatory |
LISA |
Laser Interferometer Space Antenna |
LLO |
LIGO Livingston Observatory |
LMXB |
Low-Mass X-Ray Binary |
LSC |
LIGO Scientific Collaboration also Length Sensing and Control System |
LVDT |
Linear Variable Differential Transducer |
LVEA |
Laser and Vacuum Equipment Area (at observatory corner station) |
LZH |
Laser Zentrum Hannover |
MB |
Megabyte |
MC |
Mode Cleaner |
MDC |
Mock Data Challenge |
MEPI |
Magnetic External Pre-Isolator |
MFLOPS |
Million Floating Point Operations Per Second |
MGASF |
Monolithic Geometrical Anti-Spring Filter |
MIMO |
Multiple Input, Multiple Output |
MOPA |
Master Oscillator-Power Amplifier |
MOU |
Memorandum of Understanding |
Mpc |
Megaparsec |
MPI |
Message Passing Interface |
MRE |
Major Research Equipment |
MSU |
Moscow State University |
NBI |
Neutron Star Binary Inspiral |
NPRO |
Non-Planar Ring Oscillator |
NS |
Neutron Star |
OOP |
Object-Oriented Programming |
OPD |
Optical Path Difference |
OSB |
Operations Support Building |
OSEM |
Optical Shadow Sensor and Magnetic Actuator |
PAC |
Program Advisory Committee |
PDR |
Preliminary Design Review |
PDRR |
Preliminary Design Requirements Review |
PDT |
Photodetector |
PEM |
Physical and Environmental Monitor |
PM |
Project Management |
PMP |
Project Management Plan |
Ppm |
Parts per million |
PRC |
Power Recycling Cavity |
PRM |
Power Recycling Mirror |
PSL |
Prestabilized Laser |
PZT |
PbZrxTi1-xO3 (lead zirconate titanate, a piezoelectric material) |
QND |
Quantum Non-Demolition |
QPD |
Quadrant Photo Diode |
R&D |
Research and Development |
RAID |
Redundant Array of Inexpensive Disks |
RC |
Recycling Cavity |
REO |
Research Electro-Optics (Company Name) |
REU |
Research Experience for Undergraduates |
RF |
Radio Frequency |
RFP |
Request for Proposal |
RMS |
Root mean square |
RSE |
Resonant Sideband Extraction |
s |
Second |
s/s |
Samples/second |
SAP |
Sapphire Core Optics |
SAS |
Seismic Attenuation System |
SEI |
Seismic Isolation System |
SEM |
Secondary Emission Monitor |
SIOM |
Shanghai Institute of Optical Materials |
SLC |
Stray Light Control |
SOS |
Small Optics Suspension |
SR |
Signal Recycled (interferometer configuration) |
SRD |
Science Requirements Document |
SRM |
Signal Recycling Mirror |
SUP |
Support Equipment |
SURF |
Summer Undergraduate Research Foundation |
SUS |
Suspension System |
TAMA |
Japanese Interferometric Gravitational-Wave Project |
TB |
Terabytes |
TNI |
Thermal Noise Interferometer |
UHV |
Ultra High Vacuum |
UL |
Upper Limits |
VEA |
Vacuum Equipment Area (at observatory mid- and end-stations) |
VIRGO |
Italian-French Laser Interferometer Collaboration |
VME |
Versa Modular Eurocard (IEEE 1014) |
VSRM |
Variable Signal Recycling Mirror |
WAN |
Wide Area Network |
WBS |
Work Breakdown Structure |