AAAS |
||
ACIGA |
Australian Consortium for Interferometric Gravitational Astronomy |
|
ACWP |
Actual Cost of Work Performed |
|
ADC |
||
AdL |
Advanced LIGO |
|
ALS |
Arm Length Stabilization |
|
AMU |
See also RGA |
|
ANU |
Australian National University |
|
AOC |
Adaptive Optics Compensation |
|
AOM |
||
AOS |
Auxiliary Optics System |
|
API |
Application Programming Interface |
|
ARMA |
Autoregressive Moving Average |
|
ASC |
Alignment Sensing and Control |
|
Alignment Sensing and Stabilization |
||
ATM |
Asynchronous Transfer Mode (communications protocol) |
|
BAC |
Budget at Completion |
|
BCWP |
Budgeted Cost of Work Performed |
|
BCWS |
Budgeted Cost of Work Scheduled |
|
BH |
Black Hole |
|
BSC |
Beam Splitter Chamber also Basic Symmetric Chamber |
|
CACR |
Center for Advanced Computer Research (Caltech) |
|
CAD |
Computer Aided Design |
|
CB&I |
Chicago Bridge & Iron |
|
CCB |
Change Control Board |
|
CCD |
Charged Coupled Device |
|
CDR |
Conceptual Design Review |
|
CDRL |
Contract Data Requirements List |
|
CDS |
Control and Data Systems |
|
COC |
Core Optics Components |
|
CSIRO |
Commonwealth Scientific and Industrial Research Organization (Australia) |
|
CSSR |
Cost Schedule Status Report |
|
CW |
Continuous Wave |
|
DAC |
||
DAQ |
Data Acquisition System |
|
DCC |
||
DFG |
Dynamic gravity Field Generator |
|
DMRO |
Differential Mode Read-Out |
|
DRR |
Design Requirements Review |
|
DSP |
Digital Signal Processing |
|
End-To-End Modeling (interferometer simulation software package) |
||
EAC |
Estimate at Completion |
|
ECD |
Eddy Current Damping |
|
EPI |
External Pre-Isolator |
|
EPICS |
||
ER |
Engineering Run |
|
ETF |
Engineering Test Facility |
|
ETM |
End Test Mass |
|
Ex |
Engineering Run x (e.g. E4 is Engineering Run 4) |
|
FAC |
Facility Modifications |
|
FDR |
Final Design Review |
|
FFT |
Fast (Discrete) Fourier Transform |
|
FIR |
Finite Impulse Response |
|
FSS |
Frequency Stabilization Servo |
|
FTE |
Full Time Equivalent |
|
GASF |
Geometrical Anti-Spring Filter |
|
GEO |
British-German Cooperation for Gravity Wave Experiment |
|
GFLOPS |
Billion (Giga) Floating Point Operations Per Second |
|
GG |
Gravity Gradients |
|
GPS |
Global Positioning System |
|
GRB |
||
GUI |
Graphical User Interface |
|
GWDAW |
Gravitational Wave Data Analysis Workshop |
|
GWIC |
Gravitational Wave International Committee |
|
HAM |
Horizontal Access Modules --type of vacuum chamber |
See also BSC |
HEPI |
Hydraulic External Pre-Isolator |
|
HPSS |
High Performance Storage System (IBM) |
|
HVAC |
Heating, Ventilation and Air Conditioning |
|
IDE |
Integrated Drive Electronics (disk standard) |
|
IFO |
Interferometer |
|
i.i.d. |
Independent and identically-distributed |
|
IIR |
Infinite Impulse Response |
|
InGaAs |
Indium-Gallium-Arsenide |
|
INSA |
French National Institute for Applied Science |
|
IO |
Input Optics |
|
IP |
Inverted Pendulum |
|
ISC |
Interferometer Sensing and Control |
|
Intensity Stabilization Servo |
||
ITM |
Input Test Mass |
|
IV&V |
Integration, Verification, and Validation |
|
kpc |
Kiloparsec |
|
LAL |
LIGO Algorithm Library |
|
LASTI |
LIGO Advanced System Test Interferometer |
|
LIGO Data Analysis System |
||
LHO |
LIGO Hanford Observatory |
|
LIGO |
Laser Interferometer Gravitational-Wave Observatory |
|
LISA |
Laser Interferometer Space Antenna |
|
LLO |
LIGO Livingston Observatory |
|
LMS |
Least Mean Squares |
|
LMXB |
||
LSC |
LIGO Scientific Collaboration |
|
Length Sensing and Control System |
||
LVDT |
Linear Variable Differential Transducer |
|
LVEA |
Laser and Vacuum Equipment Area (at observatory corner station) |
|
LZH |
Laser Zentrum Hannover |
|
MB |
Megabyte |
|
MC |
||
MDC |
Mock Data Challenge |
|
MEDM |
Motif Editor and Display Manager |
|
MEPI |
Magnetic External Pre-Isolator |
|
MFLOPS |
Million Floating Point Operations Per Second |
|
MGASF |
Monolithic Geometrical Anti-Spring Filter |
|
MIMO |
Multiple Input, Multiple Output |
|
MOPA |
Master Oscillator-Power Amplifier |
|
MOU |
Memorandum of Understanding |
|
Mpc |
Megaparsec |
|
MPI |
Message Passing Interface |
|
MRE |
Major Research Equipment |
|
MSU |
Moscow State University |
|
NBI |
Neutron Star Binary Inspiral |
|
NDS |
Network Data Server |
|
NPRO |
Non-Planar Ring Oscillator |
|
NS |
Neutron Star |
|
OAF |
Online Adaptive Filtering |
|
OMC |
Output Mode Cleaner |
|
OOP |
Object-Oriented Programming |
|
OPD |
Optical Path Difference |
|
OSA |
Optical Spectrum Analyser |
|
OSB |
Operations Support Building |
|
OSEM |
Optical Shadow Sensor and Magnetic Actuator |
|
PAC |
Program Advisory Committee |
|
PDR |
Preliminary Design Review |
|
PDRR |
Preliminary Design Requirements Review |
|
PDT |
Photodetector |
|
PEM |
Physical and Environmental Monitor |
|
PM |
Project Management |
|
PMC |
Pre Mode Cleaner |
|
PMP |
Project Management Plan |
|
Ppm |
Parts per million |
|
PRC |
Power Recycling Cavity |
|
PRM |
Power Recycling Mirror |
|
PSL |
Prestabilized Laser |
|
PZT |
PbZrxTi1-xO3 (lead zirconate titanate, a piezoelectric material) |
|
QND |
Quantum Non-Demolition |
|
QPD |
Quadrant Photo Diode |
|
R&D |
Research and Development |
|
RAID |
Redundant Array of Inexpensive Disks |
|
RC |
Recycling Cavity |
|
REO |
Research Electro-Optics (Company Name) |
|
REU |
Research Experience for Undergraduates |
|
RF |
Radio Frequency |
|
RFP |
Request for Proposal |
|
RLS |
Recursive Least Squares |
|
RMS |
Root mean square |
|
RSE |
Resonant Sideband Extraction |
|
s |
Second |
|
s/s |
Samples/second |
|
SAP |
Sapphire Core Optics |
|
SAS |
Seismic Attenuation System |
|
SEI |
Seismic Isolation System |
|
SEM |
Secondary Emission Monitor |
|
SIOM |
Shanghai Institute of Optical Materials |
|
SISO |
Single Input, Single Output |
|
SLC |
Stray Light Control |
|
Small Optics Suspension |
||
SPICE |
Simulation Program with Integrated Circuit Emphasis |
|
SR |
Signal Recycled (interferometer configuration) |
|
SRD |
Science Requirements Document |
|
SRM |
Signal Recycling Mirror |
|
SUP |
Support Equipment |
|
SURF |
See also 40m Summer Projects |
|
Suspension System |
||
TAMA |
Japanese Interferometric Gravitational-Wave Project |
|
TB |
||
TCS |
Thermal Compensation System |
|
TLA |
Three Letter Acronym |
|
TNI |
Thermal Noise Interferometer |
|
UGF |
Unity Gain Frequency |
|
UHV |
Ultra High Vacuum |
|
UL |
Upper Limits |
|
VCO |
Voltage Controlled Oscillator |
|
VEA |
Vacuum Equipment Area (at observatory mid- and end-stations) |
|
Italian-French Laser Interferometer Collaboration |
||
Versa Modular Eurocard (IEEE 1014) |
||
VSRM |
Variable Signal Recycling Mirror |
|
WAN |
Wide Area Network |
|
WBS |
Work Breakdown Structure |
|
WFS |
Wave-Front Sensor |