|
Size: 308
Comment:
|
Size: 376
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| A more detailed plan is coming soon. | A more [[Detailed Vent Plan|detailed]] plan is [[Detailed Vent Plan|here]] |
| Line 7: | Line 7: |
| Line 19: | Line 18: |
| [[In Air Pre-Alignment]] | [[In Air Pre-Alignment]] [[OSEM adjustment proceedure]] |
General:
- Implement DC readout at the 40m
- Detect Gravitational Waves
