Differences between revisions 1 and 2
Revision 1 as of 2006-09-07 20:09:34
Size: 308
Editor: DanielBusby
Comment:
Revision 2 as of 2006-09-10 03:50:56
Size: 329
Editor: RobertWard
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
A more detailed plan is coming soon. A more [[Detailed Vent Plan|detailed]] plan is coming soon.
Line 7: Line 7:
Line 19: Line 18:
[[In Air Pre-Alignment]]  [[In Air Pre-Alignment]]

A more detailed plan is coming soon.

General:

  1. Implement DC readout at the 40m
  2. Detect Gravitational Waves

Rough Schedule

In-vacuum tasks

DC readout requirements

Additional in-vacuum requirements

Triggers for breaking vacuum

In Air Pre-Alignment

Misc In Vac Work

Vent_Sep_2006 (last edited 2012-01-03 23:02:43 by localhost)