## page was renamed from Vacuum == all of this which is still useful should be put into the 40m DCC Vac tree == [[ http://www.ligo.caltech.edu/~ajw/40m/40mProcedures.doc ]] [[http://www.ligo.caltech.edu/~ajw/40m/40mVaccum_T000054-00.pdf ]] [[https://dcc.ligo.org/DocDB/0015/D000338/000/D000338-00.pdf]] [[Vacuum_Interlocks]] [[ V1 gate valve ]] [[ http://www.vatvalve.com/en/business/valves/product?id=10846-UE44 ]] [[8" id main gate to Maglev turbo]] [[IFO to RGA valve]] [[ http://www.vatvalve.com/business/valves/product?id=10836-UE44 ]] [[2.5" id VM1]] [[ Leybold D30A as RP1 & RP3 ]] [[attachment:Roughing_Pump_ Manual]] [[ Fore pump of TP2 & TP3 ]] [[attachment:SH-100 Dry Scroll Pump]] [[ TP2 & TP3 ]] Varian TP Manual: [[attachment:Small_Turbo_V70D.pdf]] / Varian Controller Manual: [[attachment:V70D Turbo Controller]] / Agilent Manual: [[attachment:TwisTorr 84 FS AG Rack Controller.pdf]] [[ TP1 magnetically suspended turbo ]] [[attachment:Osaka Maglev]] [[attachment:Osaka Maglev Manual]] [[attachment:Maglev Controller Communication Drawing]] [[attachment:TG390MCAB specs]] [[ VC1 cold pump ]] [[attachment:Cryo Torr 8]] [[attachment:Airgas_Vent_Air_Specs]] [[attachment:Airgas_N2_specifications]] [[attachment:Cryo_Interlock.pdf]] [[How_to_use_RGA]] [[Vacuum/TurboPumpWiring|/Turbo Pump 1 wiring]] [[Vacuum/VacuumMEDMediting|/Vacuum MEDM screen and EPICS editing]] [[attachment:Seismic_Isolation_Stacks_TM_Chambers.pdf]] [[attachment:40mChamber.PDF]] [[attachment:Pumpspool_of_Vac_Envelope.pdf]] [[attachment:VacOperationGuide.pdf]] [[attachment:Pressure_Balanced_Bellow.pdf]] [[attachment:Manual_Access_Connector_to_OOC.pdf]] [[attachment:Access_Connector_to_ITMS.pdf]] [[attachment:40M_Vac_Env_Lengths.pdf]] [[attachment:LIGO_40M_Lab_Floor_Plan.pdf]] [[attachment:40m_floor_dimensions]] [[attachment:LIGO_40M_Lab_Safety_Floor_Plan.pdf]] [[attachment:40M_Vac_Env_Side_Chamber_Stack.pdf]] [[attachment:40M_Vac_Env_Vertex_Chambers_Layout.pdf]] [[attachment:40M_Vac_Env_Layout_&_Building.pdf]] [[attachment:old_drawings_on _paper_ opt_vac_facilities]] 5E-7 Torr is the lowest pressure achieved in 40m https://nodus.ligo.caltech.edu:8081/40m/180821_160912/best_.pdf [[http://nodus.ligo.caltech.edu:8080/40m/14373]] Main vacuum heavy doors are supposed to be fastened by torque wrenches. 25 ft-lb for the 1st round and then 45 ft-lb for the 2nd round. = Crane Safety Documentation = The main Crane Safety Document for the End Station Cranes (now in the DCC): <
> [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=15072|40m Cranes Document]] [[attachment:Annual_Crane _Inspection_2018.pdf]] [[attachment:Annual_Crane_Inspection_2017.pdf]] [[attachment:Annual_Crane_Inspection_2016.pdf]] [[attachment:Annual_Crane_Inspection_and_Preventive_Maintenance_April_2013.pdf]] [[attachment:Annual_Crane_Inspection_and_Preventive_Maintenance_10_March_2011.pdf]] [[attachment:Crane_Load_Test_1_Ton_Quote_16_March_2011.docx]] [[attachment:Crane_Inspections_and_Load_tests_4_April_2011.pdf]] === Previous (Obsolete) Versions of the Crane Docs === [[attachment:E1000379_40m_cranes_document.doc]] [[attachment:CraneOperations40m.doc]] [[attachment:CraneDocument 27 August 2010_ENDS.doc]] [[attachment:CraneDocument27 August 2010_Corner-1.doc]] [[attachment:CraneDocument21July2010.doc]] [[attachment:CraneDocument21July2010_Corner.doc]] -------- The main document refers to another document for details on keeping thinks clean (wiping chambers with methanol, etc): [[attachment:Cleanliness.doc]] ==== The text that was here has been copied into the .doc files attached. ====