|
Size: 812
Comment:
|
Size: 844
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 9: | Line 9: |
| ||'''Component'''||||'''Location'''||||'''Link to product info'''|| ||e.g., Ethernet gauge||||x-end||||https://products.inficon.com/en-us/nav-products/product/detail/vgc50x/|| |
||'''Component'''||||'''Location'''||||'''Being replaced?'''||||'''Link to product info'''|| ||e.g., Ethernet gauge||||X-end||||Yes||||https://products.inficon.com/en-us/nav-products/product/detail/vgc50x/|| |
Fall 2018 Upgrade of 40m Vacuum System
Goals
- Install a network of Ethernet-capable vacuum gauges to replace the old serial-switchbox units.
- Replace the EPICS/hardware translation layer with Python-based code.
- Other hardware changes? Valves, pumps, computers?
List of all hardware that will interface with the new digital system
Component |
Location |
Being replaced? |
Link to product info |
|||
e.g., Ethernet gauge |
X-end |
Yes |
https://products.inficon.com/en-us/nav-products/product/detail/vgc50x/ |
|||
Diagram of where pumps, valves, gauges are located in the system?
