Differences between revisions 73 and 80 (spanning 7 versions)
Revision 73 as of 2010-04-13 06:18:16
Size: 2126
Editor: KojiArai
Comment:
Revision 80 as of 2010-08-02 21:47:21
Size: 2493
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
  * [[Upgrade 09/Length Sensing and Control Design|Length Sensing and Control Design]]
Line 24: Line 25:
 * '''July 20, 2010:''' [[Vent Jul 2010|2nd Vent]]
 * '''June 18, 2010:''' Input MMT installation and measurement completed
 * '''May 27, 2010:''' First Green Locking of the arm
 * '''Apr 23, 2010:''' First SHG light at the 40m for this upgrade
 * '''Apr 13, 2010:''' PRM/SRM removal form the table
Line 30: Line 36:
 * '''Nov 12-17, 2009: ETMY CDS test - Joe, Peter, Koji'''  * '''Nov 12-17, 2009:''' ETMY CDS test

Upgrade of the 40m

Events

  • July 20, 2010: 2nd Vent

  • June 18, 2010: Input MMT installation and measurement completed

  • May 27, 2010: First Green Locking of the arm

  • Apr 23, 2010: First SHG light at the 40m for this upgrade

  • Apr 13, 2010: PRM/SRM removal form the table

  • Apr 12, 2010: ITMX SOS installation completed

  • Apr 6, 2010: ITMY SOS installation completed

  • Mar 2, 2010: Vent

  • Feb 20, 2010: Power supply stop

  • Jan 28, 2010: TAC meeting Jan 2010

  • Dec 7-11, 2009: Vent for test mass cleaning

  • Nov 12-17, 2009: ETMY CDS test

TAC (Technical Advisory Comittee) meetings

Upgrade documents

Upgrade_09 (last edited 2012-01-03 23:02:41 by localhost)