Differences between revisions 54 and 84 (spanning 30 versions)
Revision 54 as of 2010-01-10 09:04:16
Size: 1111
Editor: KojiArai
Comment:
Revision 84 as of 2010-09-07 18:33:52
Size: 2702
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * '''[[/Overview]]'''  * '''[[Upgrade 09/Overview|Overview ~]]'''
Line 5: Line 5:
  * [[/Configuration]]   * [[Upgrade 09/Configuration|Optical Configuration]]
Line 8: Line 8:
  * [[/Optics]]    * [[Upgrade 09/ArmNaming|Arm Battesimo]]
  * [[Upgrade 09/Length Sensing and Control Design|Length Sensing and Control Design]]
  * [[Upgrade 09/Optics|Optics ~]]
   * [[Upgrade 09/Main Optics Phase Maps|Phase Maps of the main mirrors]]
Line 12: Line 15:
   * [[/Suspensions]]''' '''    * [[Upgrade 09/Suspensions|Suspensions ~ SOSs and TTs]]
Line 16: Line 19:
  * [[/CDS]]   * PSL Upgrade
   * [[Upgrade 09/PSL Table Lifting|PSL Table Lifting]]
   * [[Upgrade 09/PSL|New PSL Layout]]
  * [[Upgrade 09/CDS|New CDS]]
   * [[Upgrade 09/CDS/August CDS test|CDS test plan for August]]
   * [[Upgrade 09/CDS/September CDS plan|CDS test plan for September]]
Line 18: Line 26:
 * '''[[Upgrade 09/Installation Plan|Installation Plan ~]]'''

== Events ==
 * '''July 20, 2010:''' [[Vent Jul 2010|2nd Vent]]
 * '''June 18, 2010:''' Input MMT installation and measurement completed
 * '''May 27, 2010:''' First Green Locking of the arm
 * '''Apr 23, 2010:''' First SHG light at the 40m for this upgrade
 * '''Apr 13, 2010:''' PRM/SRM removal form the table
 * '''Apr 12, 2010:''' ITMX SOS installation completed
 * '''Apr 6, 2010:''' ITMY SOS installation completed
 * '''Mar 2, 2010:''' Vent
 * '''Feb 20, 2010:''' [[Power Shortage Feb 2010|Power supply stop]]
 * '''Jan 28, 2010:''' [[TAC Meeting-Jan 10|TAC meeting Jan 2010]]
 * '''Dec 7-11, 2009:''' [[Optics Cleaning|Vent for test mass cleaning]]
 * '''Nov 12-17, 2009:''' ETMY CDS test
Line 20: Line 43:
 * [javascript:void(0);/*1263114247290*/ TAC meetings]  * [[TACs|TAC meetings]]
Line 26: Line 49:
 * 40m upgarde status Ver. 1/06/2010 [attachment:100106_upgrade09.pdf [PDF]][attachment:100106_upgrade09.graffle [OmniGraffle]]
 * 40m upgrade status (KA, '10 March LVC) [attachment:LVC_March_40m_karai_100315.pdf [PDF]] [attachment:LVC_March_40m_karai_100315.tar.gz [tgzed graffle file ]]

Upgrade of the 40m

Events

  • July 20, 2010: 2nd Vent

  • June 18, 2010: Input MMT installation and measurement completed

  • May 27, 2010: First Green Locking of the arm

  • Apr 23, 2010: First SHG light at the 40m for this upgrade

  • Apr 13, 2010: PRM/SRM removal form the table

  • Apr 12, 2010: ITMX SOS installation completed

  • Apr 6, 2010: ITMY SOS installation completed

  • Mar 2, 2010: Vent

  • Feb 20, 2010: Power supply stop

  • Jan 28, 2010: TAC meeting Jan 2010

  • Dec 7-11, 2009: Vent for test mass cleaning

  • Nov 12-17, 2009: ETMY CDS test

TAC (Technical Advisory Comittee) meetings

Upgrade documents

Upgrade_09 (last edited 2012-01-03 23:02:41 by localhost)