|
Size: 1073
Comment:
|
Size: 888
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| ## page was renamed from Upgrade 08 <<TableOfContents([2])>> |
|
| Line 2: | Line 5: |
| This is a collection of links relating to the 2008 40m Upgrade. | This is a collection of links relating to the 2009 40m Upgrade. |
| Line 4: | Line 7: |
| /Overview | == Things to buy == [[Upgrade 09/Purchase List|/Purchase List]] |
| Line 7: | Line 11: |
| * [[TAC Meeting-Apr 08]] ([http://lhocds.ligo-wa.caltech.edu:8000/40m/TAC_Meeting-Apr_08?action=AttachFile&do=get&target=Upgrade08.pdf Upgrade08.pdf], or [https://40m.ligo.caltech.edu/svn/40m/docs/upgrade08/ SVN repository]) * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=%28CVS%29 "MIT CVS repository instructions for accessing AdvLIGO modeling"] |
* [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC] * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"] * 40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]] |
| Line 10: | Line 15: |
| = Upgrade of the 40m = * [[Upgrade 09/Overview|Overview of the upgrade]] * '''Overview of the upgrade''' |
|
| Line 11: | Line 19: |
| == Coatings and Optics == This is a work in progress area for what optic and coatings we need. || Parameter || ITMs || ETMs || PRM || SRM || FM (4x) || || HR Transmission 1064 nm || 0.014|| 10 ppm || || || <0.01 || || HR Transmission 532 nm || < 1000 ppm|| 0.10 || || || || || AR Reflection 1064 nm || 1000 ppm|| < 100 ppm || || || <0.01 || || AR Reflection 532 nm || <0.01|| < 1000 ppm || || || || || ROC || inf|| 40 m? || || || inf|| || Wedge angle || 1 deg || 1 deg || || || || |
||[[/Overview]] || [[/Optics]] || [[/CDS]] || [[/Suspensions]] || ||[[Upgrade 09/Optical Layout|/Optical Layout]] || [[/PDs]] ||/GreenLock || || |
<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>
Upgrade of the 40m
This is a collection of links relating to the 2009 40m Upgrade.
Things to buy
Upgrade document
[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC]
[http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"]
40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]]
Upgrade of the 40m
Overview of the upgrade
