| = Upgrade of the 40m = This page describes the big topics in the Upgrade of the 40m interferometer from Mk III to Mk IV. |
## page was renamed from Upgrade 08 == Upgrade of the 40m == * '''[[Upgrade 09/Overview|Overview ~]]''' * '''Upgrade items & Preparation status''' * [[Upgrade 09/Configuration|Optical Configuration]] * [[Upgrade 09/Optical Layout|Optical Layout]] * [[Upgrade 09/GreenLock|Green Locking]] * [[Upgrade 09/ArmNaming|Arm Battesimo]] * [[Upgrade 09/Optics|Optics ~]] * [[Upgrade 09/Main Optics Phase Maps|Phase Maps of the main mirrors]] * [[Optics Cleaning|Optics Cleaning Plan (Dec 2009)]] * [[Upgrade 09/MMT09|New Input Mode Matching]] * Mechanics * [[Upgrade 09/Suspensions|Suspensions ~ SOSs and TTs]] * Electronics * [[Upgrade 09/RF System|RF System]] * [[Upgrade 09/Multi Resonant EOM|Multi Resonant EOM]] * [[Upgrade 09/PSL|New PSL Layout]] * [[Upgrade 09/CDS|New CDS]] * [[Upgrade 09/Purchase List|Purchase List]] * '''[[Upgrade 09/Installation Plan|Installation Plan ~]]''' |
| Line 4: | Line 23: |
| The main point is to make it more like the AdvLIGO interferometer. There are not too many details on this page so as to not reduce clarity. | == Events == * '''May 2X, 2010:''' First Green Locking of the arm * '''Apr 23, 2010:''' First SHG light at the 40m for this upgrade * '''Apr 13, 2010:''' PRM/SRM removal form the table * '''Apr 12, 2010:''' ITMX SOS installation completed * '''Apr 6, 2010:''' ITMY SOS installation completed * '''Mar 2, 2010:''' Vent * '''Feb 20, 2010:''' [[Power Shortage Feb 2010|Power supply stop]] * '''Jan 28, 2010:''' [[TAC Meeting-Jan 10|TAC meeting Jan 2010]] * '''Dec 7-11, 2009:''' [[Optics Cleaning|Vent for test mass cleaning]] * '''Nov 12-17, 2009:''' ETMY CDS test |
| Line 6: | Line 35: |
| People should feel free to add comments - | == TAC (Technical Advisory Comittee) meetings == * [[TACs|TAC meetings]] |
| Line 8: | Line 38: |
| == Arm Cavity Finesse == We will change the transmission of the ITMs from 0.5% to 1.4% to match the new AdvLIGO design. We will also replace the MOS (with 1.25 kg masses) with SOSs. This is to increase the effect of radiation pressure. We will not fine-tune the coatings of the ITMs for cool dichroic properties unless some coating place gives us a <4 month lead time. == Modulation Frequencies == We will change the modulation frequencies from f1=33 MHz and f2 = 166 MHz to f1 = 9 MHz and f2 = 45 MHz. We will increase the length of the MC to accomodate this. == Recycling Cavities == We will increase the length of the RCs to handle the lower modulation frequency. This will require 2 tip/tilt mirrors per cavity. These will be imperial, eddy current damped versions of the ANU tip/tilt mirrors. Should we get new PR and SR or use what we have? (curvature, reflectivity). Maybe we should match the AdvLIGO Gouy phases. We will make the tip/tilts so that we can have a POP signal. We also keep POX & POY. == Mach Zender == We will not use a Mach Zender. We will use 2-3 EOMs in series or a UF Trimod if it shows up. == Control System Computers == We will have a big multi-core box to run all of the front ends. It will have fast fiber links to remote ADC/DACs. == Multi-wavelength Locking == Make wedges and coatings to accomodate multi-color locking if the lead time is reasonable. The beam from the end should not see the corner. == Optical Levers == Make a fiber based OL delivery scheme. Try to also make 40m long OLs by putting turning mirrors into the vacuum system. == Analog Electronics == === Suspensions === No change of the suspension analog electronics. We will have interface cards/connectors to go from new style ADC/DACs into the old analog electronics. === LSC === New RFPDs for the 9 & 45 MHz as well as 3*f1 (27 MHz). Maybe DD as well. == Cameras == We'll have GigE cameras and an all GigE backbone for all CDS connections. |
== Upgrade documents == * [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC] * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"] * 40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]] * 40m upgarde status Ver. 1/06/2010 [attachment:100106_upgrade09.pdf [PDF]][attachment:100106_upgrade09.graffle [OmniGraffle]] * 40m upgrade status (KA, '10 March LVC) [attachment:LVC_March_40m_karai_100315.pdf [PDF]] [attachment:LVC_March_40m_karai_100315.tar.gz [tgzed graffle file ]] |
Upgrade of the 40m
Upgrade items & Preparation status
Events
May 2X, 2010: First Green Locking of the arm
Apr 23, 2010: First SHG light at the 40m for this upgrade
Apr 13, 2010: PRM/SRM removal form the table
Apr 12, 2010: ITMX SOS installation completed
Apr 6, 2010: ITMY SOS installation completed
Mar 2, 2010: Vent
Feb 20, 2010: Power supply stop
Jan 28, 2010: TAC meeting Jan 2010
Dec 7-11, 2009: Vent for test mass cleaning
Nov 12-17, 2009: ETMY CDS test
TAC (Technical Advisory Comittee) meetings
Upgrade documents
[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC]
[http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"]
40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]]
40m upgarde status Ver. 1/06/2010 [attachment:100106_upgrade09.pdf [PDF]][attachment:100106_upgrade09.graffle [OmniGraffle]]
- 40m upgrade status (KA, '10 March LVC) [attachment:LVC_March_40m_karai_100315.pdf [PDF]] [attachment:LVC_March_40m_karai_100315.tar.gz [tgzed graffle file ]]